Bradenton, FL Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- National Electrical Code, 2005 Edition
- Copy on file
- City planning and community development department
- Conflicts
- More restrictive provision prevails under Sec. 18-102
- Supervision
- Master electricians registered with the city
- Temporary power
- Temporary service permit; building permit is a prerequisite
- Penalty
- Sec. 1-15: fine up to $500.00 or 60 days
Summary
Electrical work in the City of Bradenton, Florida is done under the National Electrical Code, 2005 Edition, as adopted by Sec. 18-101, and under the supervision of master electricians registered with the city. The contractor named on the construction permit answers for the whole system, and temporary construction power needs a temporary service permit plus a building permit.
The work under this article shall be performed only under the supervision of master electricians registered with the city as outlined in section 22-31 et seq. of this Code. ... The electrical contractor named on the original construction permit shall be responsible for the entire electrical system installed in the building and the connection of all equipment installed. Special permission may be granted to a second electrical contractor to connect specific equipment only; a special permit shall be required. ... Temporary power for construction shall be from a temporary pole or from existing service; a temporary service permit is required. A building permit is a prerequisite to the temporary electrical service for construction and/or remodeling power. ... There is hereby adopted for the purpose of establishing rules and regulations for electrical work in the city that code known as the National Electrical Code, 2005 Edition, a current copy of which shall remain on file in the city planning and community development department for public use, inspection and examination, and the same is hereby adopted and incorporated as fully as if set out at length herein.
Full Breakdown
Electrical rules in the City of Bradenton are split between Division 2, Inspections, and Division 3, Standards, of Article III in Chapter 18. Sec. 18-101 adopts the National Electrical Code, 2005 Edition, as fully as if set out at length in the Code, and keeps a current copy in the city planning and community development department for public use, inspection and examination. The history note printed after the section lists Ord. No. 2819, § 1, 2-22-06. Sec. 18-102 settles conflicts: if any part of Article III or another city ordinance conflicts with the adopted National Electrical Code, the more restrictive provision prevails.
Who does the work is regulated as well. Sec. 18-79 requires work under the article to be performed only under the supervision of master electricians registered with the city as outlined in Sec. 22-31 et seq. Sec. 18-80 makes the electrical contractor named on the original construction permit responsible for the entire electrical system installed in the building and the connection of all equipment. A second electrical contractor can connect specific equipment only with special permission, and a special permit is required. Under Sec. 18-83, inspections are requested only by the electrical contractor who performed the work.
Temporary power has its own permit. Sec. 18-84 requires temporary power for construction to come from a temporary pole or from existing service, requires a temporary service permit, and makes a building permit a prerequisite to the temporary electrical service for construction and remodeling power.
Permits can be lost or halted. Sec. 18-77 lets the electrical inspector revoke a permit or approval for any false statement or misrepresentation as to a material fact in the application or plans, and permit fees are not refunded in those cases. Sec. 18-76 requires work to stop on written notice from the inspector, or oral notice in an emergency. A cross reference printed under Sec. 18-101 points to Sec. 18-226 et seq. for swimming pools.
Violations & Fines
Article III violations are punished under Sec. 18-56 as provided in Sec. 1-15, in addition to other penalties: a fine of not more than $500.00 or imprisonment not exceeding 60 days, or both, with each day a separate offense. Sec. 18-78 declares hazardous electrical installations illegal and subject to abatement by rehabilitation or removal, and Sec. 18-77 revokes a permit obtained on false information without refunding fees.
Frequently Asked Questions
What edition of the National Electrical Code does Bradenton use?
Do I need a permit for temporary power at a Bradenton construction site?
Who is responsible for the electrical system on a permitted job?
Can the City of Bradenton revoke an electrical permit?
Sources & Official References
Other rules in Bradenton