Hillsboro, OR Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- Oregon Electrical Specialty Code (OAR 918-305-0100)
- Governing section
- HMC § 11.04.010(D)
- Permit expiration
- 6 months without inspection approval
- Renewal fee
- 50% of initial permit fee
- Alt-energy fee exemption
- Permit fee waived, permit still required
Summary
Hillsboro enforces electrical work through the state-adopted Oregon Electrical Specialty Code, and any permit the City issues is void if inspection approval doesn't occur within 6 months. A voided permit can be extended once or renewed once for a 50% fee, and solar and other alternative-energy installations are exempt from the permit fee itself.
D.Electrical Code. The Oregon Electrical Specialty Code, as adopted by OAR 918-305-0100 (2014). ... A.Expiration. If an inspection approval has not occurred within 6 months after a building permit is issued, it is void and no further work may be done at the identified premises until a new building permit has been obtained.B.Extension.1.An inspection approval automatically extends the building permit for 6 months, or until final approval or occupancy is granted if sooner.2.The Manager may extend a building permit once, for a period of 6 months...C.Renewal. A building permit may not be renewed if it has been expired for more than 6 months. A building permit may be renewed once provided:1.It has been expired for 6 months or less;2.No changes have been made in the original plans and specifications for such work;3.A renewal fee of 50% of the initial fee is paid; and4.An inspection approval has occurred since the expiration date.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 1 | Community Development Code: Supplement 1).
Full Breakdown
010(D) adopts, as Hillsboro's governing electrical rules, 'the Oregon Electrical Specialty Code, as adopted by OAR 918-305-0100 (2014),' making the state code, not a locally written electrical chapter, the substantive standard the City's inspectors enforce for wiring, panels, and fixture work citywide. 010 alongside the City's parallel adoptions of the Structural, Mechanical, Plumbing, Residential, Manufactured Dwelling and Energy Efficiency specialty codes, all administered by the same building permit process. 020(A) sets a hard clock: if inspection approval has not occurred within 6 months, the permit is void and no further work may occur at the premises until a new permit is obtained.
Subsection B allows one automatic 6-month extension whenever an inspection approval occurs, running until final approval or occupancy if that comes sooner, and lets the Manager grant a second 6-month extension on written finding that the permittee could not proceed for reasons beyond their control, provided the extension request arrives before expiration and an inspection occurs during that extension window. A permit that has lapsed for 6 months or less can be renewed once under subsection C, but only if the original plans and specifications are unchanged, an inspection approval has occurred since expiration, and the applicant pays a renewal fee equal to 50% of the initial permit fee; a permit expired more than 6 months cannot be renewed at all and must be reapplied for from scratch.
030 gives the Council authority to set permit fees by resolution and lets the Manager adjust fee tables to match state-mandated valuation changes, with 15 days' public notice required for other fee changes. 160, from permit fees under all applicable specialty codes, including electrical, though the underlying permit and inspection requirement still applies, and the fee exemption does not extend to modifications of existing installations that don't involve new alternative-energy equipment.
Violations & Fines
Chapter 11 sets no separate electrical-permit penalty, so a violation, working without a valid permit, or continuing work after a permit has voided under § 11.04.020(A), falls under the Code's general penalty in HMC § 1.08.010(B): a $500.00 fine, with HMC § 1.08.030 making each day of continued unpermitted work a separate $500.00 offense.
Frequently Asked Questions
What electrical code does Hillsboro enforce?
How long is a Hillsboro electrical permit valid?
Can I renew an expired electrical permit in Hillsboro?
Do I need an electrical permit to install solar panels in Hillsboro?
Sources & Official References
Other rules in Hillsboro
Compare Hillsboro to another location·View the Oregon building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Washington County handle electrical permits.