Homestead, FL Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Electrical permit required separately (Sec. 6-36)
Trade permit fee
2.0% of value of electrical work performed
Review fee
Electrical review costs $116.00 per review cycle
Homestead property surcharge
Unpermitted work: 2x permit fee + $110
Other property surcharge
Unpermitted work: 4x permit fee + $110

Summary

Homestead requires its own electrical permit before wiring work begins, separate from a general construction permit, priced at 2.0% of the value of the electrical work plus a $116 plan-review fee per cycle, with an added penalty if the work starts before the permit is issued.

All necessary permits required herein shall be obtained for the construction, reconstruction, structural alterations, demolition, or additions thereto as well as permits for plumbing, electrical, mechanical and for all uses incidental and connected thereto. ... Trade permits—Electrical, plumbing, mechanical — 2.0% of value of work. ... Electrical review $116.00 — per review cycle. ... Fee for work started without permits: when work is commenced prior to obtaining a required permit, a fee of two times that specified in this section, plus a $110.00 fee shall be paid for Homestead properties, and a fee of four times that specified in this section, plus a $110.00 fee shall be paid for nonHomestead/commercial properties.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 87).

Full Breakdown

Sec. " The council's adopted fee schedule in Sec. 00 is charged per review cycle, separate from the building, mechanical, plumbing and structural review fees the same table lists for other trades. These permits are administered by the development services department under the building code adopted in Sec. 6-21, and contractors performing the electrical work are subject to the same annual city registration requirement under Sec. 6-37 that applies to all trades, including submission of a current certificate of competency and required insurance. As with any other permit type covered by Sec.

6-36, beginning electrical work before the permit is issued exposes the property to the citywide work-without-permit surcharge set out in the same fee schedule, which doubles the fee for Homestead property or quadruples it for non-Homestead and commercial property, on top of a flat $110 charge, regardless of which trade the unpermitted work involved.

Violations & Fines

Electrical work started before the required permit is obtained is charged under Sec. 6-52's citywide work-without-permit fee: two times the normal permit fee plus $110 for Homestead property, or four times the fee plus $110 for non-Homestead or commercial property. The fee schedule specifies that paying the surcharge does not relieve the contractor or owner of full compliance with all other applicable code requirements and penalties.

Frequently Asked Questions

Do I need a separate permit just for electrical work in Homestead?
Yes. Sec. 6-36 lists electrical work among the categories requiring its own permit, separate from any general construction permit, and the fee schedule in Sec. 6-52 prices "Trade permits, Electrical, plumbing, mechanical" at 2.0% of the value of the work performed.
How much does the electrical plan review cost in Homestead?
The Sec. 6-52 fee schedule sets a specific "Electrical review" charge of $116.00 per review cycle, on top of the 2.0%-of-value electrical trade permit fee, administered by the development services department.
What if my electrician starts wiring before the permit is issued?
The same citywide surcharge applies to electrical work as to any other trade under Sec. 6-52: two times the normal permit fee plus $110 for Homestead property, or four times the fee plus $110 for non-Homestead or commercial property, and paying it doesn't excuse full compliance with the rest of the code.

Sources & Official References

Other rules in Homestead

All Homestead rules

Florida rules heatmap·Compare Homestead to another location·View the Florida building safety overview

Get notified when Electrical Permits in Homestead, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Miami-Dade County handle electrical permits.

Coral Gables, FL
Some Restrictions
Miami, FL
Some Restrictions
Miami Beach, FL
Some Restrictions