Kendall County, IL Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2023 NEC NFPA 70, § 8-19(3)
- Local amendments
- None, § 8-26
- IRC electrical inspection fee
- $75.00 per inspection
- IBC electrical inspection fee
- $100.00 per inspection
- Required inspection
- Electrical service inspection, § 8-38
Summary
Unincorporated Kendall County wires new construction to the 2023 National Electrical Code (NFPA 70), adopted as part of the County Building Code. Kendall County Code § 8-26 confirms the County made no local amendments, deletions or insertions to that code, so the NEC applies exactly as published, and Planning, Building and Zoning issues a separate electrical permit and inspection for the work.
(3)2023 National Electrical Code NFPA 70. ... Sec. 8-26. - 2017 National Electrical Code. There are no amendments, deletions or insertions to the National Electrical Code.
Full Breakdown
Kendall County Code § 8-19(3) lists the 2023 National Electrical Code NFPA 70 among the model codes the County Board adopted as the Building Code of the County, alongside the 2024 IBC, IRC, Mechanical, Fuel Gas and Existing Building Codes. Section 8-26, still titled 'Sec. - 2017 National Electrical Code' from an earlier adoption cycle, states flatly that 'there are no amendments, deletions or insertions to the National Electrical Code,' meaning Kendall County enforces the currently adopted NEC edition exactly as written, without the local carve-outs applied to the IBC and IRC.
10 per square foot. An electrical service inspection is required before the utility will energize a new service, listed among the required inspection stages at Kendall County Code § 8-38. 00 with each day of continued violation treated separately, and appeals from the Code Official's decisions go to the Planning, Building and Zoning Committee within 20 days under Section 8-23.
Violations & Fines
Electrical work performed without a permit, or that departs from an approved plan or Code Official directive, is an ordinance violation under Kendall County Code § 8-22, punishable by a fine of $50.00 to $1,000.00, with each day the violation continues after notice counted as a separate offense. Continuing electrical work after a stop-work order carries the same fine range.
Frequently Asked Questions
Which electrical code does Kendall County enforce?
How much is an electrical permit inspection in Kendall County?
Do I need an inspection before my power gets turned on?
Sources & Official References
Other rules in Kendall County
Compare Kendall County to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.