Kendall County, IL Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted plumbing code
Illinois Plumbing Code, § 8-27
Publisher
Illinois Dept. of Public Health
Plumbing inspection fee
$175.00 per inspection
Underfloor inspection
Required before covering, § 8-40
Final inspection
Before occupancy, § 8-44

Summary

Unincorporated Kendall County regulates plumbing work under the Illinois Plumbing Code rather than the model International Plumbing Code. Kendall County Code § 8-27 adopts the state code, published by the Illinois Department of Public Health, by reference to govern installation, repair and alteration of plumbing, private water supply systems, private storm drainage systems and private sewage disposal systems countywide.

These county ordinances apply to unincorporated areas of Kendall County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Sec. 8-27. - Illinois Plumbing Code. The Illinois Plumbing Code, as amended, published by the State Department of Public Health, is adopted and incorporated by reference as the rules and regulations for the installation, repair and alteration of plumbing, private water supply systems, private storms drainage systems and private sewage disposal systems.

Full Breakdown

The County Building Code substitutes the Illinois Plumbing Code for the International Plumbing Code throughout Chapter 8: Kendall County Code § 8-27 adopts the Illinois Plumbing Code, as amended and published by the Illinois Department of Public Health, by reference as the governing rules for installing, repairing or altering plumbing, private water supply systems, private storm drainage systems and private sewage disposal systems. The same substitution is written into the International Building Code amendments at Section 8-24(2), which deletes the reference to the International Plumbing Code and inserts the current Illinois Plumbing Code edition, and into the General Amendments at Sections 8-24(10) and 8-25(9).

00 per inspection whether the project is reviewed under the IRC or IBC track, on top of any plan-review charge. Two plumbing-related inspection stages are mandatory during construction: the underfloor plumbing inspection before the under-slab lines are covered (Kendall County Code § 8-40) and the rough plumbing inspection before insulation and drywall go in (Kendall County Code § 8-41), plus a final plumbing inspection before occupancy (Kendall County Code § 8-44). Private well and septic systems installed with new construction also require separate approvals that must be finalized before the Code Official will release a certificate of occupancy, per Kendall County Code § 8-45. Work performed without the required plumbing permit is enforced the same as any other Building Code violation under Section 8-22.

Violations & Fines

Installing, repairing or altering plumbing without the required permit, or contrary to an approved plan or Code Official directive, is an ordinance violation under Kendall County Code § 8-22, punishable by a fine of $50.00 to $1,000.00, with each day the violation continues after notice treated as a separate offense. Continuing plumbing work after a stop-work order draws the same fine range.

Frequently Asked Questions

Does Kendall County use the International Plumbing Code?
No. Kendall County Code § 8-27 adopts the Illinois Plumbing Code, published by the Illinois Department of Public Health, by reference in place of the International Plumbing Code for installing, repairing or altering plumbing, water supply, storm drainage and private sewage systems.
How much does a plumbing permit inspection cost?
The fee schedule at Kendall County Code § 8-46 sets the plumbing inspection fee at $175.00 per inspection, whether the work is reviewed under the residential or commercial code track.
What plumbing inspections are required during construction?
Underfloor plumbing must be inspected before it is covered under Kendall County Code § 8-40, rough plumbing before insulation and drywall under § 8-41, and a final plumbing inspection is required before occupancy under § 8-44.

Sources & Official References

Other rules in Kendall County

All Kendall County rules

Compare Kendall County to another location·View the Illinois building safety overview

Get notified when Plumbing Permits in Kendall County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.