Lee's Summit, MO Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Adopted code
2023 National Electrical Code (NFPA No. 70-2023)
Enforced by
Building Official, with designated qualified inspectors
Permit lapses
Work not started in 180 days, or suspended 180 days
Extensions
Written request, up to 180 days each
Reinstatement example
$100 permit, 30% work left, $30 fee
Work before permit
100% penalty of the building permit fee
No permit needed
Repairs, lamp swaps, low voltage wiring, utility work

Summary

Lee's Summit requires a permit and paid fees before anyone performs electrical work, enforced by the Building Official under the 2023 National Electrical Code (NFPA 70-2023) as adopted by Ord. No. 10422 on July 14, 2026. A permit lapses if work does not start within 180 days or stalls for 180 days. Repairs, lamp replacement, low voltage wiring and electric utility work are exempt.

National Electrical Code adopted. The 2023 edition of the National Electrical Code as published by the National Fire Protection Association (NFPA No. 70-2023) is hereby adopted and incorporated in this chapter as fully as if set forth herein, excepting only such parts or portions thereof as are specifically added or amended. ... A permit must be obtained and fees paid prior to any person performing electrical work. Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Before expiration date the building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. ... A permit shall not be required for the following electrical work. A. Repair work, replacement of lamps or connection of portable electrical equipment to suitable permanently installed receptacles. B. Low voltage wiring. C. Electrical work under the supervision and authority of the electric utility.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 55 | Unified Development Ordinance: Supplement 15).

Full Breakdown

Article III of the Lee's Summit Building Code was rewritten in its entirety by Ord. No. 10422, adopted July 14, 2026, replacing the version adopted March 19, 2019. Section 7-300 adopts the 2023 edition of the National Electrical Code, NFPA No. 70-2023, except for the parts the city adds or amends. The city does amend it: Sections 7-306 through 7-308 rewrite NEC Section 625.43 for electric vehicle charging equipment (EVSE) and wireless power transfer equipment (WPTE).

Section 7-301 gives enforcement to the Building Official for all electrical construction, alterations, relocations, enlargement, replacements and repairs of electrical systems, and Section 7-305 lets the Building Official designate qualified inspectors. Inspection requests must be made in advance under the most current written policies of the Codes Administration Department (Section 7-162).

Section 7-303 sets the permit rule: a permit must be obtained and fees paid prior to any person performing electrical work. A permit becomes invalid if the authorized work does not start within 180 days of issuance, or if work is suspended or abandoned for 180 days after it begins. Before expiration the Building Official can grant, in writing, one or more extensions of up to 180 days each, on a written request that shows justifiable cause. After expiration the city can assess a reinstatement fee based on the original permit fee and the percentage of work remaining. The code's own example: a $100 original fee with 30% of the work remaining produces a $30 fee. If reinstatement is not possible, the permit stays expired and a new one issues at the city's current fee schedule.

Section 7-304 exempts three kinds of work: repair work, lamp replacement and connecting portable equipment to suitable permanently installed receptacles; low voltage wiring; and electrical work under the supervision and authority of the electric utility.

For fixed in place EV chargers rated more than 60 amperes or more than 150 volts to ground, Section 7-307 requires a readily accessible, lockable disconnect, with a plaque on the equipment if the disconnect is remote. Section 7-308 adds a marked "ELECTRIC VEHICLE EMERGENCY DISCONNECT" with manual reset for fixed-in-place equipment supplying DC power to the vehicle.

Violations & Fines

Starting electrical work without a permit breaks Section 7-303. The building code's work-before-permit rule in Section 7-207 adds a 100% penalty of the required building permit fee for any person who commences work before obtaining the necessary permit. Contractors also risk discipline: under Section 7-130.12 the Board of Appeals can suspend or revoke a license after a hearing on at least ten days' notice, including for failing to obtain a permit or required inspection.

Frequently Asked Questions

Do I need a permit to replace a light bulb or fix a fixture in Lee's Summit?
Replacing lamps and repair work need no permit under Section 7-304, and neither does connecting portable equipment to a suitable permanently installed receptacle. The exemption list names only those items, low voltage wiring, and work under the electric utility, so other electrical work needs a permit and paid fees under Section 7-303 first.
How long does a Lee's Summit electrical permit last?
Section 7-303 makes a permit invalid if work is not commenced within 180 days after issuance, or if work is suspended or abandoned for 180 days after it starts. The Building Official can grant written extensions of not more than 180 days each, but you must request them in writing and show justifiable cause before the expiration date.
What does it cost to reinstate an expired electrical permit?
After expiration the city can assess a fee based on the original permit fee and the percentage of work remaining, as the Building Official determines. The code's example is a $100 original fee with 30% of work left, which means a $30 reinstatement fee. If reinstatement is not possible, a new permit issues at the current fee schedule.
What are the disconnect rules for EV chargers?
Section 7-307 requires a readily accessible, lockable disconnect for fixed in place EVSE and WPTE rated more than 60 amperes or more than 150 volts to ground, with a plaque on the equipment if the disconnect is remote. Section 7-308 covers DC equipment and requires an emergency shutoff marked ELECTRIC VEHICLE EMERGENCY DISCONNECT with manual reset.
Who enforces the electrical code in Lee's Summit?
Section 7-301 assigns enforcement to the Building Official, who heads the Development Services Department under Section 7-203. Section 7-305 lets the Building Official designate inspectors who are qualified to enforce the National Electrical Code, and inspection requests follow the Codes Administration Department's written policies.

Sources & Official References

Other rules in Lee's Summit

All Lee's Summit rules

Compare Lee's Summit to another location·View the Missouri building safety overview

Get notified when Electrical Permits in Lee's Summit, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.