Lee's Summit, MO Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing sections
Sec. 7-158 and Sec. 7-160
Foundation inspection waiver
1-2 family homes, accessory <10 ft
Grading survey required by
Registered land surveyor
Final inspection
After all permitted work completed
Reinspection fee trigger
Second failed/unready inspection call

Summary

Lee's Summit's Building Official inspects permitted work at fixed stages, from footings to the final walkthrough, and nothing can be covered up before the required inspection clears it. Sec. 7-160 lists the specific inspections; Sec. 7-158 requires work to stay exposed and accessible until the Building Official approves it.

The Building Official, upon notification, shall make the inspections set forth in this Code and the policies and procedures for required inspections.

A.Footing or foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place before inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94; the concrete need not be on the job.

...

D.Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved.

...

J.Final inspection. The final inspection shall be made after all work required by the building permit is completed.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 55 | Unified Development Ordinance: Supplement 15).

Full Breakdown

Sec. 7-158 sets the baseline rule: any construction requiring a permit stays subject to inspection, and it must remain accessible and exposed until the Building Official approves it; the permit holder is responsible for keeping it that way, and the City isn't liable for the cost of uncovering work done too soon. Sec. 7-160 lists the required inspection stages for a typical project: a footing and foundation inspection after excavation and any reinforcing steel is placed (waived for one- and two-family dwellings and accessory structures under ten feet tall); a suspended-slab or under-floor inspection before concrete or subfloor goes down; an as-built elevation and grading survey by a registered land surveyor before a certificate of occupancy issues; a frame inspection after roof sheathing, framing, fire blocking, and rough electrical, plumbing and HVAC are in and approved; a lath or gypsum board inspection before taping or plastering, with exceptions for one- and two-family homes and non-fire-rated assemblies; inspection of any fire-resistance-rated penetrations before they're concealed; special and fire-protection inspections as required; and a final inspection once all permitted work is done.

Sec. 7-162 requires the permit holder to notify the Building Official when work is ready and to provide site access, following the Codes Administration Department's current written inspection-request policies. Sec. 7-160(K) allows the City to charge a reinspection fee, set by the Schedule of Fees, when a called inspection finds the work isn't actually ready or corrections weren't made, though the first rejection for a given problem doesn't trigger the fee.

Violations & Fines

Covering or concealing work before its required inspection is approved violates Sec. 7-158 and Sec. 7-163, and the Building Official can require it uncovered again at the permit holder's expense. Calling for an inspection before the job is actually ready triggers a reinspection fee under Sec. 7-160(K) starting on the second failed call.

Frequently Asked Questions

When does Lee's Summit require a footing inspection?
After the footing excavation is complete and any required reinforcing steel is placed, per Sec. 7-160(A). It's waived for foundations on one- and two-family dwellings and accessory structures under ten feet tall, but required for everything else.
Can I cover up framing before it's inspected?
No. Sec. 7-158 requires permitted work to stay exposed and accessible until the Building Official approves it, and Sec. 7-160(D) specifically requires a frame inspection after roof sheathing, framing and rough utilities are in but before drywall goes up.
Will I be charged for a failed inspection in Lee's Summit?
Not the first time. Sec. 7-160(K) says the first rejection for failing to meet Code doesn't trigger a reinspection fee, but a second reinspection because corrections weren't made or the job wasn't ready does, at the rate set in the City's Schedule of Fees.

Sources & Official References

Other rules in Lee's Summit

All Lee's Summit rules

Compare Lee's Summit to another location·View the Missouri building safety overview

Get notified when Building Inspections in Lee's Summit, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in Jackson County handle building inspections.

Independence, MO
Some Restrictions
Kansas City, MO
Some Restrictions