Lincoln County, SD Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- ICC Electrical Code, § 151.18 (101.4.9)
- Administered by
- State of South Dakota
- GFCI upgrade rule
- § 151.18, amendment 406.1.6(5)
- County permit still required
- R105.1, § 151.33
- Max penalty
- 30 days jail / $200 fine
Summary
Unincorporated Lincoln County, South Dakota adopts the ICC Electrical Code by reference at § 151.18 (amendment 101.4.9), covering installation, alteration, repair, and replacement of electrical systems and administered by the State of South Dakota. The same chapter's amendment 406.1.6(5) still requires ground-fault circuit interrupter protection on bathroom, kitchen-counter, garage, and outdoor receptacles when an existing dwelling's service entrance is upgraded.
101.4.9 Electrical. The term ICC Electrical Code shall be mean the ICC Electrical Code as adopted by the State of South Dakota and shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances thereto. ICC Electrical Code shall be administered by the State of South Dakota. ... (5) Ground fault circuit interrupters. Ground fault circuit interrupter protection shall be provided for all receptacles in bathrooms, above kitchen counters, attached and detached garages provided with power, at readily accessible receptacles within 6 feet of sinks, unfinished basements, and at outdoor locations. The exceptions of the National Electrical Code 210.8(A) 3 and 5 shall apply.
Full Breakdown
Lincoln County's International Existing Building Code amendments at § 151.18 define the ICC Electrical Code at section 101.4.9: it applies to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances, and the county's own ordinance text states the ICC Electrical Code is administered by the State of South Dakota rather than by the county. The same amendment chapter reaches further into existing-building wiring detail at section 406.1.6, which applies when a new electrical service entrance with increased amperage is added to an existing single-family or multi-family dwelling: item (5) requires ground fault circuit interrupter protection on every receptacle in bathrooms, above kitchen counters, in attached and detached garages with power, at readily accessible receptacles within six feet of sinks, in unfinished basements, and at outdoor locations, carrying forward the exceptions in National Electrical Code Section 210.8(A)(3) and (5).
As with plumbing, the state's administration of the technical electrical code does not remove the county's own permit gate: R105.1 at § 151.33 still requires an owner or authorized agent to apply to the county building official and obtain a permit before installing, altering, or replacing any electrical system regulated by the adopted code, enforced by the Planning and Zoning Director as Building Inspector under § 151.02.
Violations & Fines
Electrical work performed without the county permit required under R105.1 is treated as unpermitted building work, subject to the R108.6 late-permit fee for each week the permit remains unobtained, and a general Uniform Building Code violation carries up to 30 days in jail and/or a $200 fine under § 151.99(B).
Frequently Asked Questions
Who administers Lincoln County's electrical code?
Do I need GFCI outlets if I upgrade my home's electrical service?
Is a county permit still needed for electrical work?
Sources & Official References
Other rules in Lincoln County
Compare Lincoln County to another location·View the South Dakota building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.