Key Facts

Building Inspector
Planning and Zoning Director, § 151.02
Footing inspection
before concrete pour, R109.1.1
Floodplain inspection
required in flood hazard areas, R109.1.3
Final inspection
required before occupancy, R110.1
Max penalty
30 days jail / $200 fine, § 151.99(B)

Summary

In unincorporated Lincoln County, South Dakota, the Planning and Zoning Director acts as Building Inspector under § 151.02 and must inspect construction at defined stages. Under the county's adopted International Residential Code amendments at § 151.33, a footing inspection (R109.1.1) is required before concrete is poured, and a final inspection (R110.1) must be completed and passed before any building or change of occupancy is used or occupied.

These county ordinances apply to unincorporated areas of Lincoln County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

R109.1.1 Footing inspection. Inspection of the footing shall be made after poles or piers are set or trenches or basement areas are excavated and any required forms erected and any required reinforcing steel is in place and supported prior to the placing of concrete. The footing inspection shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. ... R110.1 Use and occupancy. No building or structure shall be used or occupied, and a change of occupancy or change of use of a building or structure or portion thereof shall not be made until the building official has completed a final inspection and all construction and code requirements have been met to the building official’s satisfaction. Approval of a final inspection shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the county.

Full Breakdown

Chapter 151 makes the Planning and Zoning Director the Building Inspector for the county, unless the Board of County Commissioners appoints someone else, and charges that office with enforcing all regulations on construction, alteration, removal, and demolition of buildings and making all necessary inspections, per § 151.02. The county's IRC amendments at § 151.33 spell out the required inspection stages by adopting the International Code Council's R100-series sections with local edits. R109.1.1 requires a footing inspection after piers or trenches are excavated and any required forms and reinforcing steel are in place, before concrete is poured; the same inspection covers excavations for thickened slabs supporting bearing walls or equipment and any special wood-foundation requirements.

For work in a mapped flood hazard area, R109.1.3 adds a floodplain inspection once the lowest floor is placed, requiring a design professional's sealed elevation certificate submitted to the floodplain administrator before further vertical construction, with a second elevation submission due under R109.1.6.1 before the final inspection. R110.1 then bars occupying or changing the use of any building until the building official completes a final inspection and confirms every construction and code requirement has been met; passing that final inspection does not excuse any other code or ordinance violation. Inspectors mark approved work with placards or inspection record tags under R110.6, which may not be removed except with the building official's authorization.

Violations & Fines

Occupying a building before the building official completes and approves the final inspection violates R110.1 and the § 151.02 inspection duty. Chapter 151 violations without a specific penalty default to § 10.99, while failing to comply with the Uniform Building Code carries up to 30 days in jail and/or a $200 fine under § 151.99(B).

Frequently Asked Questions

Who performs building inspections in unincorporated Lincoln County?
The Planning and Zoning Director serves as the county's Building Inspector under § 151.02, unless the Board of County Commissioners appoints a different building inspector to enforce construction and demolition regulations.
When must a footing inspection happen?
Under R109.1.1, adopted at § 151.33, the footing inspection must occur after excavation and any required forms and reinforcing steel are in place, and before concrete is poured for the foundation.
Can I move into a new house before the final inspection?
No. Section R110.1 bars using or occupying any building, or changing its occupancy, until the building official has completed a final inspection and confirmed all construction and code requirements are met.

Sources & Official References

Other rules in Lincoln County

All Lincoln County rules

Compare Lincoln County to another location·View the South Dakota building safety overview

Get notified when Building Inspections in Lincoln County, SD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.