Lower Merion, PA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Before any electrical work in the Township
Adopted standard
ICC Electrical Code / National Electrical Code
Drawing threshold
Licensed drawings required over $7,500 in work
Inspection deadline
Certificate due within 15 days of completion
Maximum fine
$1,000 per offense (§ 72-15)
Appeal path
Examining Board, then Building and Planning Committee

Summary

Lower Merion requires a permit from the Code Official before any electrical work begins in the Township, under Chapter 72 of the Township Code, which adopts the ICC Electrical Code and, through it, the National Electrical Code as the governing standard. New commercial, public, industrial, and apartment work needs drawings signed by a licensed architect or professional electrical engineer unless the job costs under $7,500, and violating the chapter risks a fine of up to $1,000 for each offense under Section 72-15.

§ 72-4. Adoption of standards. ... A certain document ... marked and designated as the "ICC Electrical Code" published by the International Code Council, has been adopted as the Electrical Code of the Township of Lower Merion as provided in Chapter 143 hereof, Uniform Construction Code. ... § 72-6. Permits required for electrical work. ... No person shall perform any electrical work in the Township unless he first obtains a permit from the Code Official. ... § 72-15. Violations and penalties. ... Any person who shall perform any electrical work contrary to the provisions of the National Electrical Code or this chapter or who shall fail to comply with any regulation, order or direction of the Code Official shall be liable, on conviction thereof, to a fine or penalty not exceeding $1,000 for each and every offense; and whenever such person shall have been notified by the Code Official or by service of summons in a prosecution or in any other way that he is committing such violation of this chapter, each day in which he shall continue such violation after such notification shall constitute a separate offense punishable by a like fine or penalty.

Full Breakdown

Section 72-4 of the Lower Merion Township Code adopts the ICC Electrical Code, published by the International Code Council, as the Electrical Code of the Township, incorporated by reference into Chapter 143, the Uniform Construction Code, with local insertions naming Lower Merion Township as the jurisdiction and directing that fees be set under Chapter A167. Section 72-5 requires that all electrical work in the Township meet the standards of that adopted code and of Chapter 72 itself. Section 72-6 makes the permit the gatekeeper: no person may perform electrical work in the Township without first obtaining a permit from the Code Official, and the application must state the nature and location of the work, the name and address of the person performing it, plans and specifications, and any other information the Code Official requires.

For new commercial, public, and industrial buildings and apartments, Section 72-6C requires electrical drawings signed by an architect or a professional electrical engineer licensed in the Commonwealth, unless the estimated cost of the work is under $7,500. Section 72-7 exempts only minor work, such as replacing light bulbs or fuses or plugging a portable appliance into an existing outlet, from the permit and code requirements. Fees are set under the Township Schedule of Fees under Section 72-8, and Section 72-9 requires inspections and tests by the Code Official or an approved inspecting agency, with a certificate of inspection due within 15 days of completing the work; a contractor with an overdue final inspection on one job cannot get a new permit until it is filed.

An appeal from a Code Official decision goes first to the Examining Board and then, as a recommendation, to the Building and Planning Committee, with further appeal to the Montgomery County Court of Common Pleas, all within Section 72-13's 10-day filing window. Section 72-15 makes a violation of the National Electrical Code or Chapter 72 punishable by a fine of not more than $1,000 for each offense, with each continuing day after notice treated as a separate offense.

Violations & Fines

Performing electrical work in the Township without first obtaining a permit from the Code Official, or contrary to the National Electrical Code or Chapter 72, violates Section 72-6. Section 72-15 sets the penalty at a fine of not more than $1,000 for each offense, and once the Code Official or a summons has given notice of the violation, each additional day it continues is a separate offense, collectible as fines are by law.

Frequently Asked Questions

Do I need a permit for electrical work in Lower Merion?
Yes. Section 72-6 of the Township Code makes it unlawful to perform any electrical work in the Township without first obtaining a permit from the Code Official, with the application stating the work's nature, location, and the name of the person performing it.
Is any electrical work exempt from the permit?
Section 72-7 exempts only minor work, such as replacing light bulbs or fuses or connecting a portable appliance to an existing receptacle, from both the National Electrical Code and Chapter 72's permit requirement; everything else needs a permit first.
When do I need an engineer's drawings for electrical work?
Section 72-6C requires electrical drawings signed by an architect or a Commonwealth-licensed professional electrical engineer for new commercial, public, and industrial buildings and apartments, unless the estimated cost of the electrical work is less than $7,500.
What's the fine for unpermitted electrical work?
Section 72-15 sets a fine of not more than $1,000 for each offense, and after the Code Official gives notice, every day the violation continues is charged as a separate offense, so an unresolved problem multiplies quickly.

Sources & Official References

Other rules in Lower Merion

All Lower Merion rules

Compare Lower Merion to another location·View the Pennsylvania building safety overview

Get notified when Electrical Permits in Lower Merion, PA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Montgomery County handle electrical permits.

Pottstown, PA
Some Restrictions