Mobile, AL Building Safety: Electrical Permits (2026)
Key Facts
- Minimum permit fee
- $10.00
- Exempt
- minor repairs, lamp replacement
- Exempt
- temporary testing systems
- 200-amp service fee
- $15.00
Summary
Mobile requires an electrical permit for most work under City Code Section 11-35, exempting only minor repairs, radio/TV transmission wiring, and temporary testing systems.
(1)Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Electrical permits shall not be required for the following:a.Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.b.Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but does apply to equipment and wiring for power supply, the installations of towers and antennas.c.Temporary testing systems: A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.(2)Electrical permit fee. On all electrical installations requiring an electrical permit, a fee for each permit shall be paid as required at the time of filing the application, in accordance with the schedule that follows.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 67).
Full Breakdown
Mobile City Code Sec. 11-35 requires a permit, with fees set on a sliding scale by ampere rating, for electrical system alterations, repairs, and installations. Only three narrow categories are exempt: minor repair work such as replacing lamps or plugging into existing outlets, wiring for radio/TV transmitting equipment (though not power supply or antenna installation), and temporary systems used solely for testing or servicing electrical equipment. New buildings' electrical work is billed inside the overall building permit fee under Sec. 11-34; standalone service work starts at a $10.00 minimum permit fee.
Violations & Fines
Performing electrical alterations, repairs, or installations without the required permit exposes the work to stop-work action and fee penalties under chapter 11's building code enforcement provisions.
Frequently Asked Questions
Do I need a permit to replace a light fixture in Mobile?
What's the minimum electrical permit fee in Mobile?
Sources & Official References
Other rules in Mobile
Compare Mobile to another location·View the Alabama building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.