Monroe Township (Gloucester County), NJ Building Safety: Electrical Permits (2026)
Key Facts
- Base tier
- $75 for one to 50 receptacles or fixtures
- Added receptacles
- $15 for each additional 25
- Minimum permit fee
- $75 for a basic construction permit
- Largest motor tier
- $640 above 100 horsepower
- Solar PV
- $65 for one to 50 kilowatts
- Reviewing official
- Electrical Subcode Official
Summary
Monroe Township, Gloucester County, prices electrical permits under § 104-18 of its Township Code by the receptacle, fixture, motor and service panel. One to 50 receptacles or fixtures cost $75, each added 25 cost $15, and the minimum fee for any basic construction permit is $75.
The minimum fee for a basic construction permit covering any or all of building, plumbing, electrical or fire protection work shall be $75. ... Electrical fixtures and devices. ... For from one to 50 receptacles or fixtures, the fee shall be in the amount of $75; and for each 25 receptacles or fixtures in addition to this, the fee shall be in the amount of $15. For the purpose of computing this fee, receptacles or fixtures shall include lighting outlets, wall switches, fluorescent fixtures, convenience receptacles, smoke and heat detectors or similar fixtures and motors or devices of less than or equal to one horsepower or one kilowatt. ... For each motor or electrical device greater than one horsepower and less than or equal to 10 horsepower and for transformers and generators greater than one kilowatt and less than or equal to 10 kilowatts, the fees shall be $20. ... The fee for fire or burglar or security alarm systems or intercom systems or central vac systems shall be $50.
Full Breakdown
Electrical work in Monroe Township is reviewed by the Electrical Subcode Official, one of the officials of the Monroe Township Construction Code Enforcing Agency created by § 104-17 A. The price list is § 104-18 C(1)(c), 'Electrical fixtures and devices,' adopted by the Township Council as part of the Uniform Construction Code article.
The base tier covers one to 50 receptacles or fixtures for $75, with $15 for each additional 25. For that count, receptacles or fixtures include lighting outlets, wall switches, fluorescent fixtures, convenience receptacles, smoke and heat detectors or similar fixtures, and motors or devices of one horsepower or one kilowatt or less. Larger equipment is priced separately: $20 for a motor or device above one horsepower up to 10 horsepower, $65 for above 10 up to 50 horsepower or a service panel, service entrance or subpanel of 200 amperes or less, $150 for above 50 up to 100 horsepower or a panel above 200 up to 1,000 amperes, and $640 for a motor above 100 horsepower or a panel above 1,000 amperes. All motors except those in plug-in appliances are counted, including control equipment, generators, transformers and heating or cooking devices.
Flat fees apply to common installations: $50 each for a fire, burglar, security, intercom or central vacuum system, an A/C unit, an electric range, a spa or hot tub and an electric water heater; $15 for a garbage disposal, dishwasher or hydromassage tub; $25 for a rain sensor on a sprinkler system; and $10 per light standard with a $50 minimum. Photovoltaic systems are $65 for one to 50 kilowatts, $129 for 51 to 100 kilowatts and $640 above 100 kilowatts. Replacing electric heating, cooling or kitchen cooking equipment in R-2, R-3 or R-5 buildings is $30 per appliance.
Section 104-20 B adds a state training surcharge of $1.35 per $1,000 of value on construction other than new buildings and additions. Section 104-18 F waives construction fees for work designed solely to promote accessibility by disabled persons.
Violations & Fines
Section 104-25 punishes violating the Uniform Construction Code article, building contrary to a permit condition, or ignoring an Enforcing Agency order with a fine of not more than $1,000, up to 90 days in jail, or both. Refusing an inspector lawful entry carries the same ceiling. Each day of continued work after a stop-construction order is a separate offense, collected in a summary proceeding under the Penalty Enforcement Law.
Frequently Asked Questions
How does Monroe Township count receptacles and fixtures for the fee?
What does a larger motor or service panel cost?
What is the fee for a rooftop solar system?
Are electrical fees waived for accessibility work?
Sources & Official References
Other rules in Monroe Township (Gloucester County)
Compare Monroe Township (Gloucester County) to another location·View the New Jersey building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.