Skip to main content
CityRuleLookup

Portland, OR Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit required
before most electrical work
Adopted code
Oregon Electrical Specialty Code (OESC)
Applications to
Portland Permitting & Development
Unpermitted work
stop-work order + investigation fee

Summary

Portland requires an electrical permit before most electrical work begins, under Title 26, and enforces the Oregon Electrical Specialty Code as the city's adopted electrical code with a short list of exceptions.

An electrical permit must be obtained prior to commencing any work for which an electrical permit is required. Exception: Emergency or unanticipated electrical work may be started under a temporary permit provided the nature of the work, and the procedure followed by the contractor, meet the requirements of ORS 479.550 and OAR 918-309-0080.

B. Electrical permits are not required for the following electrical installations:

1. Work performed under a valid electrical Master Permit (Industrial Plant) Program in accordance with OAR Chapter 918 and Chapter 26.08 of this Title;

2. Work defined as a minor installation in OAR Chapter 918 for which a minor label has been obtained from the Bureau;

3. Repair or replacement of light fixtures, light switches, lighting ballast, electrical outlets or smoke detectors in a building used for housing purposes that is owned, leased, managed or operated by a housing authority;

4. Repair, alteration or replacement of existing electrical products at an industrial plant, a commercial office building, a building that is owned, leased, managed or operated by the state or a local government entity or other facilities designated by the Electrical and Elevator Board when the owner, operating manager or electrical contractor of the facility who meets the provisions of ORS 479.630(1) and (2) obtains a master permit for inspection under ORS 479.560(3).

Full Breakdown

Portland City Code Title 26 requires an electrical permit before commencing any work for which one is required, with narrow exceptions such as minor installations, light-fixture and outlet repairs in housing-authority buildings, and replacing bulbs or fuses. Applications go to Portland Permitting & Development on Bureau forms, with fees paid at application. The city adopts the Oregon Electrical Specialty Code (OESC), as set by OAR 918-305-0100 and 918-305-0105, as its governing electrical code.

Violations & Fines

Starting electrical work without a required permit can trigger a City Administrator investigation, a stop-work order under § 26.03.080, an investigation fee, and civil penalties set by ORS, OAR, or city code.

Frequently Asked Questions

Do I need a permit for minor electrical repairs in Portland?
No. Replacing bulbs, fuses, or connecting portable equipment to existing outlets is exempt under § 26.04.010.B, along with a short list of other minor installations.
What electrical code does Portland use?
Portland adopts the Oregon Electrical Specialty Code (OESC) as its Electrical Code by reference under § 26.01.030, per state OAR provisions.

Sources & Official References

Other rules in Portland

All Portland rules

Compare Portland to another location·View the Oregon building safety overview

Get notified when Electrical Permits in Portland, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Multnomah County handle electrical permits.

Gresham, OR
Some Restrictions