Skip to main content
CityRuleLookup

Richland, WA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Electrical permit issuer
Washington State L&I, not the City of Richland
City's role
Declined to adopt the code's electrical permit subsection
Contractor requirement
Still needs Richland business license plus L&I registration
Occupancy tie-in
CO withheld until L&I and all agencies sign off
Minimum fine
$250 for related Title 21 violations

Summary

In the City of Richland, Washington, RMC § 21.01.020(D)(2) declines to adopt the model building code's electrical permit and exemption subcategory at all. Instead, every electrical permit, and every exemption from one, in Richland is set by the Washington State Department of Labor and Industries, not Development Services.

2. Electrical. This entire subcategory, including repairs and maintenance, radio and television transmitting devices, and temporary testing systems, shall not be adopted. All electrical permits and permit exemptions shall be as set forth by the State of Washington Department of Labor and Industries.

Full Breakdown

When Richland amended Chapter 1 of the International Building and Residential Codes through RMC § 21.01.020, it carved electrical work out entirely. Subsection D.2 states that the model code's electrical work-exempt-from-permit subcategory, covering repairs and maintenance, radio and television transmitting devices, and temporary testing systems, is not adopted, and that all electrical permits and permit exemptions are instead set by the Washington State Department of Labor and Industries. That means a Richland homeowner or electrician applies to the state, not city Development Services, for the electrical permit itself and for any inspection tied to it.

The city has not walked away from the broader project, though: RMC § 21.01.020(E) still requires every contractor and subcontractor doing that work to hold a current City of Richland business license under Title 5 and a current Washington L&I contractor registration before starting, and if the electrical work is part of a larger project needing its own building permit, RMC § 23.70.030's general permit requirement and the Title 21 building-code amendments still apply to the rest of the structure. The city's building official also still reviews the project for the certificate of occupancy under RMC § 21.01.020(G), which cannot issue until every agency with jurisdiction, state L&I included, has signed off.

Violations & Fines

Because the electrical permit itself sits with Washington L&I, Richland's own penalty at RMC § 21.01.050 reaches unpermitted electrical work only as part of a broader Title 21 violation: a civil infraction under RMC Title 10 with a fine of at least $250, or a criminal misdemeanor under RMC § 9.02.020(C), with each continuing day counted as a separate offense.

Frequently Asked Questions

Does the City of Richland issue electrical permits?
No. RMC § 21.01.020(D)(2) specifically declines to adopt the building code's electrical permit and exemption subcategory, leaving all electrical permits and exemptions to the Washington State Department of Labor and Industries.
Where do I actually apply for an electrical permit for my Richland project?
With the Washington State Department of Labor and Industries, not Richland Development Services; RMC § 21.01.020(D)(2) sends electrical permitting and its exemptions there entirely.
Do I still need a Richland business license to do electrical work here?
Yes. RMC § 21.01.020(E) requires every contractor and subcontractor, electrical included, to hold a current City of Richland business license and a current Washington L&I contractor registration before starting any construction work.
Can I get my certificate of occupancy without an electrical inspection?
No. RMC § 21.01.020(G) blocks the certificate of occupancy until every agency with jurisdiction over the project, including Washington L&I for electrical work, has approved it.

Sources & Official References

Other rules in Richland

All Richland rules

Compare Richland to another location·View the Washington building safety overview

Get notified when Electrical Permits in Richland, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Benton County handle electrical permits.

Kennewick, WA
Some Restrictions