Richland, WA Building Safety: Electrical Permits (2026)
Key Facts
- Electrical permit issuer
- Washington State L&I, not the City of Richland
- City's role
- Declined to adopt the code's electrical permit subsection
- Contractor requirement
- Still needs Richland business license plus L&I registration
- Occupancy tie-in
- CO withheld until L&I and all agencies sign off
- Minimum fine
- $250 for related Title 21 violations
Summary
In the City of Richland, Washington, RMC § 21.01.020(D)(2) declines to adopt the model building code's electrical permit and exemption subcategory at all. Instead, every electrical permit, and every exemption from one, in Richland is set by the Washington State Department of Labor and Industries, not Development Services.
2. Electrical. This entire subcategory, including repairs and maintenance, radio and television transmitting devices, and temporary testing systems, shall not be adopted. All electrical permits and permit exemptions shall be as set forth by the State of Washington Department of Labor and Industries.
Full Breakdown
When Richland amended Chapter 1 of the International Building and Residential Codes through RMC § 21.01.020, it carved electrical work out entirely. Subsection D.2 states that the model code's electrical work-exempt-from-permit subcategory, covering repairs and maintenance, radio and television transmitting devices, and temporary testing systems, is not adopted, and that all electrical permits and permit exemptions are instead set by the Washington State Department of Labor and Industries. That means a Richland homeowner or electrician applies to the state, not city Development Services, for the electrical permit itself and for any inspection tied to it.
The city has not walked away from the broader project, though: RMC § 21.01.020(E) still requires every contractor and subcontractor doing that work to hold a current City of Richland business license under Title 5 and a current Washington L&I contractor registration before starting, and if the electrical work is part of a larger project needing its own building permit, RMC § 23.70.030's general permit requirement and the Title 21 building-code amendments still apply to the rest of the structure. The city's building official also still reviews the project for the certificate of occupancy under RMC § 21.01.020(G), which cannot issue until every agency with jurisdiction, state L&I included, has signed off.
Violations & Fines
Because the electrical permit itself sits with Washington L&I, Richland's own penalty at RMC § 21.01.050 reaches unpermitted electrical work only as part of a broader Title 21 violation: a civil infraction under RMC Title 10 with a fine of at least $250, or a criminal misdemeanor under RMC § 9.02.020(C), with each continuing day counted as a separate offense.
Frequently Asked Questions
Does the City of Richland issue electrical permits?
Where do I actually apply for an electrical permit for my Richland project?
Do I still need a Richland business license to do electrical work here?
Can I get my certificate of occupancy without an electrical inspection?
Sources & Official References
Other rules in Richland
Compare Richland to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Benton County handle electrical permits.