Tigard, OR Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit rule
Separate permit for each separate building or structure
Issued by
The building official
Plan review
Required, per OAR 918-311-0000 through 0060
Plan review expiry
180 days after application, one extension up to 180 days
Work without a permit
Investigation fee equal to the permit fee
Maximum penalty
$5,000 per offense; $1,000 per day if continuing

Summary

In the City of Tigard, Oregon, no electrical work can be performed without a separate electrical permit for each separate building or structure, obtained first from the building official. Plan review is required, fees are set by City Council resolution, and starting without a permit adds an investigation fee equal to the permit fee.

A. Permit Required. ... Except as permitted by OAR 918-261-0000 through 0039, electrical work exempt from permit, subsection O of this section for minor installations, subsection P of this section for temporary electrical permits and subsection Q of this section for industrial plant electrical permits, no electrical work shall be performed unless a separate electrical permit for each separate building or structure has first been obtained from the building official. ... E. Plan Review Requirements. Electrical plan reviews shall be required. Plan review requirements and procedures shall be as stipulated in OAR 918-311-0000 through 0060. ... G. Permit Fees. Fees for electrical permits shall be established by resolution of the city council. ... 2. Fee. ... An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by this code if a permit were to be issued.

Full Breakdown

Tigard Municipal Code § 14.04.065 is the city's electrical program. Subsection A makes the permit the starting point: no electrical work is performed unless a separate electrical permit for each separate building or structure has first been obtained from the building official. The exceptions are the ones the section itself names: work exempt under OAR 918-261-0000 through 0039, minor installations (subsection O, using minor installation labels under OAR 918-050-0500 through 0520), temporary electrical permits (subsection P, OAR 918-309-0080) and industrial plant electrical permits (subsection Q, OAR 918-309-0100). Section 14.04.030 adopts the Electrical Specialty Code as one of the state specialty codes the City of Tigard administers under ORS 455.150.

Electrical plan review is mandatory under subsection E, with procedures set by OAR 918-311-0000 through 0060. An application with no permit issued within 180 days expires, and the building official can extend that once, by not more than 180 days, if the applicant shows circumstances beyond their control; after expiration the applicant resubmits plans and pays a new plan review fee. Permits themselves expire under OAR 918-309-0000(7). Fees for electrical permits are set by resolution of the City Council.

Refunds are capped. The building official can refund an erroneously paid fee, not more than 80% of the permit fee when no work has been done, and not more than 80% of the plan review fee when an application is withdrawn before review effort is spent, but only on written application filed within 180 days of payment. Issuing a permit does not approve any violation of the code, and the building official can suspend or revoke a permit issued in error or on incorrect information. The official can enter a building at reasonable times to inspect after presenting credentials, disconnect service in an emergency, and order defective equipment removed or restored under a written notice with a fixed time limit.

Violations & Fines

Starting electrical work without a permit triggers a special investigation before any permit issues, and an investigation fee equal to the permit fee is added on top of it whether or not a permit is later issued (§ 14.04.065(H)). Under § 14.04.090(D) and (E), installing or altering electrical equipment contrary to Chapter 14.04 carries an administrative civil penalty of not more than $5,000 per offense or not more than $1,000 for each day of a continuing offense. The building official can serve a written stop order, and no one can reconnect power to equipment ordered disconnected until permits and inspections are approved.

Frequently Asked Questions

Does a homeowner need an electrical permit in the City of Tigard?
Under § 14.04.065(A), no electrical work in the City of Tigard is performed unless a separate permit for each building or structure has first been obtained from the building official. The exceptions are those allowed by OAR 918-261-0000 through 0039 and the minor installation, temporary and industrial plant provisions in subsections O, P and Q. The section does not carve out homeowners by name.
What happens if electrical work starts before the permit is issued?
The building official makes a special investigation before any permit can be issued. An investigation fee equal to the permit fee is collected in addition to the permit fee, whether or not a permit is then or later issued, and paying it does not excuse compliance with other provisions or any other penalty prescribed by law (§ 14.04.065(H)).
How long does an electrical permit application stay open in Tigard?
An application with no permit issued within 180 days of the date of application expires. The building official can extend the time once, for not more than 180 days, on a showing that circumstances beyond the applicant's control prevented action. After expiration the applicant resubmits plans and pays a new plan review fee (§ 14.04.065(F)).
Can the City of Tigard cut power to a building?
Yes, in an emergency. The building official or an authorized representative can disconnect electrical service where necessary to eliminate an immediate hazard to life or property, and must whenever possible notify the serving utility, owner and occupant beforehand and in writing right afterward. Written notice of a disconnection also goes to the utility, owner and occupant within 24 hours (§ 14.04.065(L) and (M)).

Sources & Official References

Other rules in Tigard

All Tigard rules

Compare Tigard to another location·View the Oregon building safety overview

Get notified when Electrical Permits in Tigard, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Washington County handle electrical permits.

Hillsboro, OR
Some Restrictions
Beaverton, OR
Some Restrictions