Key Facts

Code adopted
2005 National Electrical Code, § 500.010
Upgrade/addition permit
$50 flat fee (§ 500.020)
Payment
Due at application; never refunded
Jurisdiction name
Rewritten to City of Waynesville
Penalty
General § 100.020 (no NEC-specific fine printed)

Summary

Waynesville adopted the 2005 National Electrical Code by § 500.010, renaming the jurisdiction into the code and tying its fee-schedule cross-reference to the City's own Fee Schedule Exhibit A. Under the general Building Permit Fee Schedule at § 500.020, an electrical, plumbing or mechanical upgrade or addition permit costs a flat $50.

The following Sections of the 2005 Edition of the National Electrical Code are revised as follows: In Section 101.1 The name of the jurisdiction is City of Waynesville. In Section 106.5.2 The schedule is per attached Fee Schedule Exhibit A. ... Electrical, plumbing or mechanical upgrade or addition $50.00 each $50.00 each

Full Breakdown

Section 500.010 of the Waynesville Municipal Code adopts the 2005 Edition of the National Electrical Code for the City, then revises two of its sections to fit local administration: Section 101.1 is amended so the code's jurisdiction reads 'City of Waynesville,' and Section 106.5.2 is amended so its fee-schedule reference points to the City's own attached Fee Schedule Exhibit A rather than a blank in the model code. That fee schedule surfaces in § 500.020's Building Permit Fee Schedule, which lists a flat $50 fee, with a $50 minimum, for an 'electrical, plumbing or mechanical upgrade or addition.' As with every other building permit in Chapter 500, the fee must be paid to the City at the time the application is submitted, the application gets no consideration until it is paid in full, and the fee is not refunded whether the City approves or denies the permit.

The 2005 NEC's own substantive wiring, load and installation requirements are adopted unchanged; only the jurisdiction name and the fee cross-reference were rewritten locally. The Building Inspector, operating under the City Administrator per Ch. 116, administers electrical permits alongside building, plumbing and mechanical permits, since all four trades share the same § 500.020 fee schedule and application process. Waynesville is a Missouri city of the third class where the Mayor and City Council legislate by ordinance.

Violations & Fines

Electrical work performed without paying the § 500.020 permit fee is not authorized, since the City will not act on an application until the fee is paid in full and keeps that fee regardless of outcome. Because § 500.010 does not write its own electrical penalty clause, an unpermitted electrical job is enforced as a general Municipal Code violation under § 100.020, punished per the current Uniform Fine Schedule for Municipal Offenses in Waynesville Municipal Court.

Frequently Asked Questions

What electrical code does Waynesville, Missouri use?
The City adopted the 2005 Edition of the National Electrical Code under § 500.010, amending only the jurisdiction name (Section 101.1) and the fee-schedule cross-reference (Section 106.5.2) to point to Waynesville's own Fee Schedule Exhibit A; the code's own wiring and installation requirements otherwise apply unchanged.
How much does an electrical permit cost in Waynesville?
Section 500.020's Building Permit Fee Schedule lists a flat $50 fee, with a $50 minimum, for an electrical, plumbing or mechanical upgrade or addition, due when the application is submitted and non-refundable regardless of the outcome of the review.
What happens if I do electrical work without a permit in Waynesville?
Because the City will not consider an application until the § 500.020 fee is paid, unpermitted electrical work is not authorized and is enforced as a general Municipal Code violation under § 100.020's Uniform Fine Schedule for Municipal Offenses, prosecuted in Municipal Court.

Sources & Official References

Other rules in Waynesville

All Waynesville rules

Compare Waynesville to another location·View the Missouri building safety overview

Get notified when Electrical Permits in Waynesville, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.