West Des Moines, IA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted electrical code
- 2020 NEC, state-mandated edition
- NEC updates
- Follow Iowa DPS current edition
- Inspection duty
- Permit holder must schedule inspections
- Inspection deadline
- 180 days or permit may be voided
- Appeal window
- 10 days to Appeals Board
- Appeal fee
- $100 filing fee, waivable for cause
- General penalty
- Up to $750, $1,000 repeat
Summary
In the City of West Des Moines, electrical installations fall under the city's adopted Building Code, which incorporates the National Electrical Code, including any current amendments the state of Iowa adopts, as part of its requirements. City Code section 8-2A-3 puts the burden on the permit holder to schedule inspections, and failing to check in within 180 days can void or revoke the permit.
Amend Section 101.4 of the IBC (Referenced Codes) and Section R102.4 of the IRC (Referenced Codes and Standards) by adding the following: 1. The provisions adopted by the State of Iowa (Iowa Department of Public Safety) including but not limited to the current edition and amendments of the International Energy Conservation Code (IECC) and the current edition and amendments of the National Electrical Code (NEC), shall be considered part of the requirements of this code. ... Amend Section 105.6 of the IBC and Section R105.6 of the IRC (Suspension or Revocation) by adding the following conditions: It is the responsibility of the permit holder to schedule the required inspections and obtain final approval. Failure to schedule the required inspections and receive approval of work authorized by the permit before covering said work or at completion shall result in revocation of the permit ... Failure to contact the City for any inspection or follow-up within 180 days of permit approval shall also be deemed a violation of this code section, and the approved permit may be voided or revoked.
Full Breakdown
Title 8, Chapter 2, Article A of the West Des Moines City Code is the city's adopted Building Code: section 8-2A-1 pulls in the 2021 International Building Code and International Residential Code, plus the state-mandated 2020 edition of the National Electrical Code as published by the National Fire Protection Association, incorporated by reference in their entirety except where the city amends or deletes a provision. Section 8-2A-3 amends the administrative chapter of the IBC and IRC and adds language to Section 101.4 confirming that whatever edition and amendments of the NEC and the International Energy Conservation Code the Iowa Department of Public Safety currently has adopted are also folded into the city's requirements, so the electrical standard tracks the state's updates rather than freezing at the 2020 edition named in section 8-2A-1.
The same section amends Section 105.6, Suspension or Revocation: it is the permit holder's job, not the city's, to schedule every required inspection and get final approval before covering the work, and failing to do that, or failing to contact the city for an inspection or follow-up within 180 days of permit approval, is itself a code violation that can void or revoke the permit, separate from any penalty for working without one. The Director of Development Services, Building Official, Rental Inspector and similar staff carry out plan review, permits and inspections under section 8-2A-3.
A property owner or contractor who disputes a permit decision can appeal to the Municipal Code Appeals Board under section 8-2F-4 within ten days of the Building Official's decision, by filing a written petition with a $100.00 fee that the City Council can waive for cause.
Violations & Fines
Covering electrical work before it passes inspection, or going more than 180 days without contacting the city for an inspection, violates City Code section 8-2A-3 and can void or revoke the permit outright. Because Title 8 sets no separate fine for this, the general penalty in section 1-4-2 applies: a municipal infraction civil penalty of up to $750.00 per violation, $1,000.00 for a repeat offense.
Frequently Asked Questions
What electrical code does West Des Moines use?
Who is responsible for scheduling an electrical inspection?
Can I appeal a denied or revoked electrical permit?
Sources & Official References
Other rules in West Des Moines
Compare West Des Moines to another location·View the Iowa building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.