Monroe County, FL Building Safety: Green Building Code (2026)
Key Facts
- Bonus points
- +3 for national model green building code certification
- Applies to
- Tier III parcels in residential ROGO scoring
- Cistern credit
- +1 point for a 1,000-gallon permanent cistern
- Gray water credit
- +2 points for Florida Building Code gray water system
- Solar credit
- +1 point for a 3 kW solar photovoltaic system
- Administered by
- Planning and Environmental Resources Department
Summary
Monroe County has not adopted a separate green building code for the unincorporated Florida Keys. Instead, the county's Rate of Growth Ordinance (ROGO) permit-allocation system rewards it: a Tier III dwelling unit certified to a sustainable building rating system or a national model green building code earns 3 competitive points toward the annual residential building-permit lottery, alongside credits for a 1,000-gallon cistern, a gray water system and solar power.
(d)Dwelling unit allocation required. The county shall issue no building permit for a dwelling unit unless such dwelling unit:(1)Has a dwelling unit allocation award; or(2)Is exempted from the dwelling unit allocation system pursuant to this chapter or is deemed vested pursuant to Section 138-22. ... ... Sec. 138-28. - Evaluation Criteria (ROGO). ... (10)Energy and Water Conservation. The following points shall be assigned to allocation applications on lands designated as Tier III to encourage the planting of native vegetation and promote water conservation and increased energy efficiency: Point Assignment: Criteria: +3 Proposes a dwelling unit designed according to and certified to the standards of a sustainable building rating or national model green building code. +1 Dwelling unit includes installation of a permanent concrete cistern with a minimum capacity of 1,000 gallons. +2 Dwelling unit includes the installation of a gray water reuse system, meeting the requirements of the Florida Building Code. +1 Dwelling unit includes installation of a solar photovoltaic collection system, a minimum of 3KW in size or the equivalent in other renewable energy systems.*
Full Breakdown
In the unincorporated Florida Keys, Monroe County limits new residential construction through the Rate of Growth Ordinance (ROGO) because the county is a state-designated Area of Critical State Concern. Under Land Development Code Section 138-24(d), the county shall issue no building permit for a dwelling unit unless it has a dwelling unit allocation award or is otherwise exempted or vested, so every new home in the unincorporated Keys must first win one of the limited quarterly ROGO allocations administered by the Planning and Environmental Resources Department.
Section 138-28(a)(10), the Energy and Water Conservation scoring category, is where the county's green-building policy actually lives: for applications on Tier III (infill) parcels, a proposal for a dwelling unit designed according to and certified to the standards of a sustainable building rating or national model green building code earns 3 additional competitive points. Those points stack with other conservation credits under the same subsection: 1 point for installing a permanent concrete cistern of at least 1,000 gallons, 2 points for a gray water reuse system meeting the Florida Building Code, and 1 point for a solar photovoltaic system of at least 3 kilowatts or an equivalent renewable-energy system.
Because ROGO allocations are awarded competitively by descending point total within each subarea and quarter, a green-building certification directly improves an applicant's odds of receiving one of the scarce annual allocations ahead of a rival application without it. The county does not require green certification to build a home; it is an optional scoring boost layered onto the growth-management permit lottery, not a mandatory construction standard.
Violations & Fines
There is no fine for skipping green certification; it simply costs the 3-point credit under Section 138-28(a)(10), which can be the margin between winning and losing a ROGO allocation that quarter. Building without a valid allocation award is a separate, more serious problem: Section 138-24(d) bars the Building Department from issuing any residential building permit until an allocation has been awarded, and unpermitted construction is enforced as a code violation by Monroe County Code Compliance.
Frequently Asked Questions
Does Monroe County require a green building code for new homes in the Keys?
What other credits can I stack with the green building points?
Can I get a building permit without a ROGO allocation, green-certified or not?
Sources & Official References
Other rules in Monroe County
Florida rules heatmap·Compare Monroe County to another location·View the Florida building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.