Lawrence, KS Building Safety: Building Inspections (2026)
Key Facts
- Governing sections
- Lawrence City Code §§ 5-303 to 5-318
- Footing/foundation
- Inspected before pouring concrete
- Rough inspection
- Before covering plumbing/electrical/gas
- Final inspection
- After all permitted work complete
- Reinspection fee
- $66.00 per hour
- First rejection
- Free, no reinspection fee
Summary
The City of Lawrence's building official inspects permitted work at fixed stages set out in Lawrence City Code §§ 5-303 through 5-315: footing and foundation, framing, plumbing/mechanical/gas/electrical rough-in, and a final inspection after all permitted work is done. The permit holder has to call for each inspection and keep the work exposed until the building official signs off.
The building official, upon notification, shall make the inspections set forth in sections 5-304 through 5-314, inclusive. ... Footing and foundation inspection ... s shall be made after excavations for footings are complete and any required reinforcing steel is in place. ... Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys, and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes, and ducts are approved. ... The final inspection shall be made after all work required by the building permit is completed.
Full Breakdown
Lawrence City Code § 5-303 directs the building official to make the inspections set out in §§ 5-304 through 5-314 for any permitted work, and § 5-301 requires that work stay visible and accessible for each inspection until it is approved; the owner or authorized agent bears the duty of keeping it that way, and neither the building official nor the city is liable for the cost of exposing work that was covered too soon. The sequence runs roughly in construction order: the footing and foundation inspection under § 5-304, made after excavation and any reinforcing steel are in place; the concrete slab and under-floor inspection under § 5-305, made after in-slab reinforcing and building service equipment are in place but before concrete is poured or subfloor installed; the rough plumbing, mechanical, gas and electrical inspection under § 5-306, made before those systems are covered and before the framing inspection; the framing inspection under § 5-307, made once the roof deck, framing, fire blocking and bracing are up and the rough trades are approved; and, for projects involving lath or gypsum board, that inspection under § 5-309.
The final inspection under § 5-315 comes only after all work the permit covers is complete. 00 per hour in § 5-254(c), when a requested inspection finds the work incomplete or uncorrected, except that the very first rejected inspection on a job is free. Under § 5-318, no work may proceed past the point of a given inspection until the building official has approved it.
Violations & Fines
Covering or concealing work before the required inspection under §§ 5-304 through 5-309 means opening it back up at the owner's own expense, since neither the building official nor the city bears that cost under § 5-301. A reinspection fee of $66.00 per hour applies under § 5-254(c) when a requested inspection finds the work incomplete or uncorrected, though the first rejected inspection on a job is free under § 5-317.
Frequently Asked Questions
What inspections does a Lawrence building permit require?
What happens if I cover work before it's inspected?
Does Lawrence charge for a failed inspection?
Sources & Official References
Other rules in Lawrence
Compare Lawrence to another location·View the Kansas building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.