Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Final reinspection fee
$50.00 per trade inspector
Threshold for that fee
Construction valued over $5,000
Cost proof before CO
Owner affidavit (Sec. 7-10)
Sidewalk sign-off
Public Works report (Sec. 7-12)
Refund basis
Volume of work actually completed

Summary

New Britain ties the last stages of a construction project to inspection under sections 7-1, 7-10 and 7-12: a fifty dollar fee applies every time a trade inspector is called back for a final reinspection on jobs over five thousand dollars, and the certificate of occupancy cannot issue until costs are verified and, where applicable, public works confirms sidewalk repairs.

The fees for final reinspection for construction over five thousand dollars ($5,000.00) shall be fifty dollars ($50.00) for each trade inspector called for reinspection. This fee shall apply each time an inspector is called for a final reinspection. ... When the job is completed, the chief building official may request proof of the total construction cost done under all approved permits, and the owner, agent, or contractor shall furnish an affidavit of the total construction costs to the chief building official. If the final cost exceeds the fee declared in the application for the building permit, certificate of occupancy can not be issued until additional fee has been paid to the department. ... Before a certificate of occupancy can be issued by a chief building official, the department of public works shall submit a report verifying that all sidewalks and curbs have been restored and/or replaced in accordance with the city standards.

Full Breakdown

Section 7-1(d) sets a fifty dollar fee for final reinspection on construction valued over five thousand dollars, charged each time a trade inspector is called back to reinspect the work. Section 7-10 lets the chief building official demand proof of total construction cost once the job is finished, requiring the owner, agent or contractor to furnish an affidavit of the actual costs; if the final cost exceeds what was declared on the permit application, the certificate of occupancy cannot be issued until the additional permit fee is paid.

Section 7-12 adds a sidewalk-specific inspection step: any permit for new construction on a lot next to an existing sidewalk requires the applicant to restore or replace defective or construction-damaged sidewalks and curbs to city standards, and before the chief building official can issue a certificate of occupancy, the department of public works must submit a report verifying that restoration was completed. Section 7-7 covers the reverse case, crediting or refunding fees for work never completed once inspection confirms the actual volume finished, after any outstanding penalties are collected.

Together these sections show the inspection sequence running from trade reinspections during construction, through a cost-verification inspection at completion, to a public works sidewalk sign-off, all gating final issuance of the certificate of occupancy by the department of licenses, permits and inspections.

Violations & Fines

A certificate of occupancy will not issue under section 7-10 until any cost overrun above the permitted value is paid, and under section 7-12 it is withheld until public works confirms sidewalk and curb restoration; each additional trade reinspection called under section 7-1(d) adds a fifty dollar fee to the project regardless of the original permit cost.

Frequently Asked Questions

What happens at final inspection for a New Britain building permit?
The chief building official can require proof of the total construction cost under section 7-10 before a certificate of occupancy issues, and if the job is valued over five thousand dollars, each additional trade inspector called back for a final reinspection adds a fifty dollar fee under section 7-1(d).
Does New Britain inspect sidewalks before issuing a certificate of occupancy?
Yes, when the lot sits next to an existing sidewalk. Section 7-12 requires the department of public works to submit a report confirming that any defective or construction-damaged sidewalks and curbs were restored to city standards before the chief building official can issue the certificate of occupancy.
Is there a fee if my New Britain project needs a second final inspection?
Yes. Section 7-1(d) charges fifty dollars for each trade inspector called back for a final reinspection whenever the underlying construction is valued over five thousand dollars, and the fee applies every single time an inspector must return to the site, not just once per overall project.

Sources & Official References

Other rules in New Britain

All New Britain rules

Compare New Britain to another location·View the Connecticut building safety overview

Get notified when Building Inspections in New Britain, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.