Key Facts

Inspection response time
2 working days after contractor notice
Re-inspection fee trigger
3rd inspection caused by contractor error
Housing violation correction window
Up to 60 days, 2 extensions
Second conviction fine
Minimum $500 plus daily fine
Two inspection tracks
Building (170.10.06(a)); Housing (170.10.06(b))

Summary

Every stage of permitted construction work in Springfield must be inspected before it's covered up. Sec. 170.10.06(a) requires the contractor to notify the Building and Zoning Department, which must inspect within two working days, and imposes a re-inspection fee if a third inspection is needed because of the contractor's own errors.

(a)Building inspections.(1)The owner or titleholder of record of the building or property or person committing the violation shall be responsible for violations cited by the building inspector.(2)Upon completion of each portion of the permitted work, the permittee shall notify the department, which shall inspect the work within two working days after notice is given. When any equipment or work authorized by the department is to be concealed from view, the permittee shall notify the department which shall inspect the work as called for above. If any equipment or work, authorized by the department, is concealed from view before the required inspections have been conducted by the department, the contractor responsible for having the work concealed shall be required to pay a fee, as provided for in this chapter. The contractor will also be required to expose portions of the covered work in order for the inspections to occur. If the department fails to inspect the work within two working days after receiving notice, the equipment or work may be concealed.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 82).

Full Breakdown

Springfield's inspection scheme splits into two tracks under Sec. 06. Building inspections in (a) govern permitted construction work: the owner, titleholder or person committing a violation is responsible for violations cited by the building inspector under (a)(1); the permittee must notify the department after completing each portion of permitted work and before concealing any of it, and the department must inspect within two working days of that notice, or the work may be concealed without penalty if the department misses the deadline, per (a)(2). Concealing work before the required inspection makes the responsible contractor pay a fee and re-expose the work.

A third inspection triggers a re-inspection fee under (a)(3) when caused by any of six listed contractor failures: missed access on the scheduled date, not following approved plans, giving a wrong site address, not correcting violations cited on a previous inspection, calling for an inspection before the work is ready, or not having approved plans on the job site. Housing inspections under (b) follow a separate track for occupied properties: a written violation notice delivered by mail or hand must identify the address and violations and give up to 60 days to correct, extendable twice for substantial progress, warning of a fine on conviction and a mandatory minimum $500 fine plus a daily fine on a second conviction within a year.

Violations & Fines

A contractor who conceals permitted work before the required inspection must expose it again and pay a re-inspection fee. Calling for a third inspection because of a missed appointment, wrong address, uncorrected prior violations, or work called in before it's ready also triggers the re-inspection fee under Sec. 170.10.06(a)(3). On the housing side, failing to correct a cited violation within the notice period, capped at 60 days plus two 60-day extensions, exposes the owner to conviction and fines.

Frequently Asked Questions

How soon after I call for an inspection will Springfield send someone?
Within two working days of your notice to the Department of Building and Zoning, under Sec. 170.10.06(a)(2). If the department misses that two-day window, the code allows the equipment or work to be concealed without further delay, so the deadline runs both ways.
What triggers a re-inspection fee?
A third inspection becomes necessary because you missed a scheduled access appointment, didn't follow approved plans, gave the wrong site address, failed to fix violations from a prior inspection, called before the work was ready, or didn't have approved plans on site, per Sec. 170.10.06(a)(3).
How long do I have to fix a housing code violation?
The written notice specifies a correction deadline that can't exceed 60 days. If you're making substantial progress, the department can extend that twice more, 60 days each time, before pursuing a fine under Sec. 170.10.06(b).

Sources & Official References

Other rules in Springfield

All Springfield rules

Compare Springfield to another location·View the Illinois building safety overview

Get notified when Building Inspections in Springfield, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.