Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issuer
City building inspector
Adopted code
Wis. Admin. Code SPS 381-387
Fee basis
Wis. Admin. Code SPS 302.31
Sewer inspection timing
Before backfilling, test on
Inspection wait cap
2 business days

Summary

Fitchburg, Wisconsin requires a plumbing permit from the city building inspector before any plumbing work starts. The city adopts the Wisconsin Plumbing Code (Admin. Code SPS 381-387) by reference, so plumbing in this Dane County suburb must meet the state standard enforced through the local permit process.

Sec. 35-101. - Electrical, plumbing and heating permits. No person shall commence any electrical, plumbing or heating work covered by this article without first obtaining an electrical permit therefor from the building inspector. ... The provisions of the following state codes and subsequent amendments and recodifications thereto are hereby adopted by reference and incorporated in this article as if fully set forth. Violations of the provisions hereby adopted shall be deemed a violation of this chapter and subject to enforcement and abatement procedures as set forth in section 35-59. ... (5)Wis. Admin. Code SPS 381-387, Plumbing Code.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30).

Full Breakdown

Fitchburg City Code Sec. 35-101 prohibits anyone from commencing plumbing work covered by chapter 35 without first obtaining a permit from the building inspector. Sec. 35-77(5) adopts Wis. Admin. Code SPS 381-387, the Plumbing Code, by reference along with subsequent amendments and recodifications, incorporating it into the city's article as if fully set forth; a violation of that adopted code is treated as a violation of the city chapter and enforced through the same procedures as any other building-code violation. Applications follow the general permit process under Division 5: a written application identifying the owner and the contractor doing the work (Sec.

35-135), plans where the scope requires them, and the applicable fee under Wis. Admin. 31. Plumbing installations require a building-sewer inspection after the sewer line goes in but before backfilling, while the water or air test is still on, and a rough inspection after piping is run but before it is enclosed, plus a final inspection before occupancy (Sec. 35-220(1), (4), (6)). No plumbing may be covered or concealed before the required inspection and the building inspector's approval, except where the inspector fails to respond within two business days of a proper request (Sec. 35-219). Sec. 35-78 resolves conflicts by applying whichever of the city, state or referenced standard is more stringent on a given point.

Violations & Fines

Plumbing work done without a permit, or in violation of the adopted Plumbing Code, is enforced under Sec. 35-59: the building inspector may issue a notice of violation and order, suspend or revoke the permit, and refer the matter to the city attorney for a chapter 18 citation imposing a forfeiture or a court injunction. Where no specific fee-schedule penalty applies, Sec. 1-21's general penalty governs: $25.00 to $500.00 for a first offense and $50.00 to $1,000.00 for repeat offenses within a year, with each day a violation continues counted as a separate offense.

Frequently Asked Questions

Do I need a plumbing permit in Fitchburg, WI?
Yes. Sec. 35-101 requires a permit from the building inspector before any plumbing work covered by chapter 35 begins, issued through the same application process used for other building permits under Division 5.
What plumbing code applies in Fitchburg?
The city adopts Wis. Admin. Code SPS 381-387, the state Plumbing Code, by reference under Sec. 35-77(5), including later amendments, so all plumbing work must meet the current state standard as enforced by the city building inspector.
When is a plumbing inspection required?
A building-sewer inspection happens after the sewer line is installed but before backfilling, and a rough inspection happens after piping is run but before it is enclosed; work cannot be covered until the building inspector approves under Sec. 35-218 and Sec. 35-220.

Sources & Official References

Other rules in Fitchburg

All Fitchburg rules

Compare Fitchburg to another location·View the Wisconsin building safety overview

Get notified when Plumbing Permits in Fitchburg, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Dane County handle plumbing permits.

Madison, WI
Some Restrictions
Middleton, WI
Some Restrictions
Sun Prairie, WI
Some Restrictions