Summary
Unincorporated Floyd County has adopted the International Plumbing Code, as amended by the State of Georgia, to govern the installation and repair of plumbing and plumbing appliances, enforced by the building inspection department under a separately issued plumbing permit.
Plumbing code. There is hereby adopted for the purpose of the public health, welfare and safety, that certain state minimum standard codes known as the International Plumbing Code, and all subsequent amendments thereto, as adopted and as amended by the State of Georgia, except such portions as are deleted, modified or amended in this article. Chapter 1 of such code, including the adopted modifications and amendments, is hereby incorporated by reference, and made a part of this article as if fully set forth herein. Amendments shall be construed as superseding only that part of the section with which there is a conflict. Copies of such specifications, rules and regulations shall be kept on file and open for public inspection in the office of the building inspection department.
Full Breakdown
Section 2-6-3(g) of the Floyd County Code adopts the International Plumbing Code, and all subsequent amendments as adopted and amended by the State of Georgia, as the plumbing code of the county, with Chapter 1 of the code and any local deletions or modifications controlling where they conflict with the state text. Copies of the adopted specifications, rules and regulations are kept on file and open for public inspection at the building inspection department. Section 2-6-1 makes it unlawful to install or repair plumbing or plumbing appliances unless the work complies with this chapter, and the chief building inspector or a designee enforces the code and issues the permit.
2(a)(8), plumbing permits must be issued separately by the Building Official, or separately identified on the building permit, and work by that trade cannot start until its permit issues. 2 requires two plumbing-related inspections during construction: a plumbing connections inspection of the water supply line and sewer lateral in a slab foundation, and a rough-in inspection confirming rough-ins are complete and all fixtures installed before interior walls can be covered. 1(b) further requires a Floyd County Health Department permit before a building permit can even be issued.
Violations & Fines
Installing or repairing plumbing without complying with Section 2-6-3(g) or without the required permit violates Section 2-6-1(d), punishable as provided in Section 2-1-8, with each day of continued violation a separate offense. Covering walls before the plumbing rough-in inspection passes can trigger a stop-work order from the building inspection department.
Frequently Asked Questions
What plumbing code applies in unincorporated Floyd County?
Do I need a separate plumbing permit from the building permit?
What plumbing inspections happen during construction?
Sources & Official References
Other rules in Floyd County
Compare Floyd County to another location·View the Georgia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.