Haverhill, MA Building Safety: Plumbing Permits (2026)
Key Facts
- Residential plumbing fee
- $50 + $10/fixture
- Commercial plumbing fee
- $100 + $20/fixture
- Reinspection fee
- $30
- Unpermitted work
- all fees doubled
- Enforcing office
- Plumbing/Gas Inspector
- Same-day inspection cutoff
- 9:00 a.m.
Summary
Plumbing work in the City of Haverhill requires a permit under the fee schedule set out in Haverhill City Code § 120-11.D, adopted under the authority of the Massachusetts State Building Code. Residential plumbing permits cost $50 per dwelling unit plus $10 per fixture, and all fees double if work starts before the permit issues.
D. Plumbing fees. Plumbing fees are as follows: ... Type Fee Replacement hot water heater $20 Residential (per dwelling unit, plus $10 per fixture) $50 Commercial (per unit, plus $20 per fixture) $100 ... Reinspection fee (for each notice) $30
Full Breakdown
Section 120-11 replaces the City's building, plumbing, gas and electrical permit fee schedules under the authority of MGL c. 23B, §§ 17 and 19, now MGL c. 143, § 93 et seq., and Section 119.0 of the Massachusetts State Building Code, incorporating the attached fee tables directly into Chapter 120. Subsection D sets the plumbing fee table administered by the Plumbing/Gas Inspector: $20 to replace a hot water heater, $50 per residential dwelling unit plus $10 per fixture, $100 per commercial unit plus $20 per fixture, $50 to remodel water or waste piping only, $100 to cap a sewer for demolition, $150 for piping and treatment of special waste plus $20 per fixture with stamped drawings required, $30 for each reinspection, and $50 for a commercial or residential water main backflow device plus $10 per fixture or device.
Section 120-11E's local regulations require mailed applications to allow at least three days for issuance before work starts, and callers must verify the application was received and processed; inspection requests must be made by 9:00 a.m. for a same-day appointment, and the office must be notified immediately when a job finishes. As with every permit under this chapter, § 120-11E(4) doubles all fees if work starts before the permit is obtained or before the Plumbing/Gas Inspector gives verbal permission. There is no fee at all when the City of Haverhill itself is the property owner or lessee performing the work.
Violations & Fines
Starting plumbing work before the permit issues, or before the Plumbing/Gas Inspector grants verbal permission, doubles every fee due under § 120-11E(4), whether it is the base fixture charge, the reinspection fee, or the backflow-device fee. Failing to notify the office when a plumbing job finishes, as § 120-11E(3) requires, can also delay the final inspection needed to close out the permit.
Frequently Asked Questions
How much is a residential plumbing permit in Haverhill?
What happens if I do plumbing work without a permit first?
How do I schedule a plumbing inspection in Haverhill?
Sources & Official References
Other rules in Haverhill
Compare Haverhill to another location·View the Massachusetts building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.