Plumbing permits in San Ramon are issued through Contra Costa County Building Inspection Division and governed by the 2022 California Plumbing Code. Permits are required for water heater replacements, repiping, sewer lateral work, gas line modifications, backflow prevention devices, and fixture additions. Like-for-like fixture swaps (faucets, toilets in existing location) generally do not require permits, but water heater and gas work always do. EBMUD or DSRSD serves as the water provider depending on location, and Central Contra Costa Sanitary District (Central San) handles sewer permits.
San Ramon adopts the California Plumbing Code (Title 24 Part 5) through its municipal code and the Contra Costa County Building Division administers permitting. Plumbing permits are required for: water heater installation or replacement (including tankless conversions), new or relocated fixtures, repiping, sewer lateral repair or replacement, gas line modifications or new gas appliances, water softeners, water service line work, and backflow prevention device installation. All water heaters must meet current seismic strapping, T&P relief valve, expansion tank, and venting requirements. Tankless water heater conversions require electrical and gas upgrades documented in the permit. San Ramon water service is split between the Dublin San Ramon Services District (DSRSD) serving most of the city and East Bay Municipal Utility District (EBMUD) in some areas; each has separate service requirements. Sewer work connecting to the main is permitted by Central Contra Costa Sanitary District (Central San), which requires a separate lateral permit and compaction testing for trenches. Licensed C-36 plumbing contractors must perform most work; owner-builders may perform work on their primary residence. CalGreen requires low-flow fixtures (1.28 gpf toilets, 1.2 gpm lavatory faucets, 1.8 gpm kitchen faucets) on new installations. Inspection sequence typically includes rough, top-out, and final.
Contact your local code enforcement office for specific penalty information.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
San Ramon, CA
San Ramon prohibits amplified music audible beyond the property line of the source, with stricter enforcement during quiet hours (10 PM-7 AM). Outdoor events...
San Ramon, CA
Construction in San Ramon is permitted Monday-Friday 7:30 AM to 5:30 PM and Saturday 9:00 AM to 5:00 PM. No construction is allowed on Sundays or city-recogn...
San Ramon, CA
San Ramon prohibits long-term on-street parking of recreational vehicles, boats, trailers, and oversized vehicles under California Vehicle Code Section 22507...
San Ramon, CA
San Ramon permits 6-foot fences in side and rear yards and 3.5-foot (42-inch) fences in front yards. Corner lots have additional sight-triangle restrictions ...
San Ramon, CA
Hedges in San Ramon are regulated similarly to fences for sight-line purposes. Front yard hedges must not exceed 3.5 feet within the front setback, and corne...
San Ramon, CA
San Ramon borders extensive East Bay Regional Park District open space (Las Trampas, Bollinger Canyon, Iron Horse Trail) hosting deer, coyotes, mountain lion...
Side-by-side rule comparisons with other cities in Contra Costa County.
See how other cities in Contra Costa County handle plumbing permits.
See how San Ramon's plumbing permits rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.