Key Facts

Adopting section
BMC § 15.04.010(A), Part 5
Local amendment
BMC § 15.04.020, CPC § 1208.5
Underground metal gas piping
Needs chief building official approval
Required study
Soils (pH) analysis for corrosivity
Fees
Set by city council resolution
Latest update
Ord. 1090, effective 12/9/2025

Summary

Brentwood adopts Part 5, the California Plumbing Code, by reference under Municipal Code Section 15.04.010, then locally amends CPC Section 1208.5 in Section 15.04.020 to ban underground metallic gas piping unless the chief building official approves it after a soils analysis for corrosive acid levels.

Adoption. ... The following volumes and appendices of the California Building Standards Code, 2025 Edition, published by the California Building Standards Commission are adopted by reference: ... Part ... 5, California Plumbing Code including: Appendix A, Recommended Rules for Sizing the Water Supply System; ... Appendix ... H, Private Sewage Disposal Systems; ... Appendix ... J, Combination of Indoor and Outdoor Combustion and Ventilation Opening Design. ... Fees. ... The fees for permits issued under this chapter are those established by resolution of the city council. § ... 15.04.020. ... Amendments. The 2025 California Plumbing Code is hereby amended by the changes, additions and deletions set forth in this section, and section numbers below refer to that code: CPC Section 1208.5: High levels of acid (pH) found in many locations throughout the city from natural soils and imported soils have proven to have a highly corrosive effect on metallic piping laid underground. The city prohibits the use of metallic gas piping underground without the approval of the city's chief building official and a soils analysis showing a level of (pH) that will not corrode metallic piping.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4604307; v5 updated 2025-12-09).

Full Breakdown

010(A) adopts Part 5, the California Plumbing Code, from the 2025 California Building Standards Code, along with Appendix A (sizing the water supply system), Appendix B (combination waste and vent systems), Appendix D (sizing storm water drainage systems), Appendix H (private sewage disposal systems), Appendix I (PEX tubing installation standards) and Appendix J (combustion and ventilation opening design). 5 because, as the code explains, high levels of acid (pH) found in many locations throughout the city from natural soils and imported soils have proven corrosive to metallic piping laid underground.

The amendment prohibits installing metallic gas piping underground without the approval of the city's chief building official, backed by a soils analysis showing a pH level that will not corrode the pipe. 010(C) leaves the fee schedule to a separate city council resolution rather than the ordinance text. Both sections have been amended together on each code cycle, most recently by Ordinance 1090, effective December 9, 2025, following Ordinance 1049 in 2022, Ordinance 1011 in 2019 and Ordinance 979 in 2016, each of which updated both the adoption and the local plumbing amendment in tandem.

Violations & Fines

Section 15.04.010(D) lets the city enforce Chapter 15.04, including the adopted Plumbing Code and the Section 15.04.020 gas-piping amendment, through any remedy set out in the California Building Standards Codes or in Brentwood Municipal Code Title 1 (General Provisions). Installing metallic gas piping underground without the chief building official's approval and a qualifying soils analysis is a direct violation of the local CPC 1208.5 amendment, independent of any base Plumbing Code violation.

Frequently Asked Questions

What plumbing code does Brentwood use?
Brentwood adopts Part 5, the 2025 California Plumbing Code, by reference under Municipal Code Section 15.04.010(A), including appendices covering water supply sizing, storm drainage sizing, private sewage disposal and PEX tubing installation.
Can I install metal gas piping underground in Brentwood?
Only with approval. Section 15.04.020 amends CPC Section 1208.5 to prohibit underground metallic gas piping unless the city's chief building official approves it based on a soils analysis showing the local pH will not corrode the pipe.
Why does Brentwood restrict underground metal gas piping?
The code states that high acid (pH) levels in natural and imported soils throughout the city have proven highly corrosive to metallic piping laid underground, which is why Section 15.04.020 requires a soils analysis before it can be approved.
Who enforces Brentwood's plumbing permit rules?
Section 15.04.010(D) authorizes the city to enforce Chapter 15.04, covering both the adopted Plumbing Code and the local gas-piping amendment, using any remedy available under the California Building Standards Codes or BMC Title 1.

Sources & Official References

Other rules in Brentwood

All Brentwood rules

California rules heatmap·Compare Brentwood to another location·View the California building safety overview

Get notified when Plumbing Permits in Brentwood, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Contra Costa County handle plumbing permits.

San Ramon, CA
Some Restrictions
Antioch, CA
Some Restrictions