Key Facts

Permit required for
Any plumbing or drainage installation, § 19.12.010
Adopted code
Wis. Stats. ch. 145, SPS 325 and SPS 381-387
Building permit first
No plumbing permit until building permit issued
Fee rules
Non-refundable, non-transferable; tripled if work starts early
Permit lapse
Automatic after 60 days inactive, § 19.12.060
Who applies
Licensed master plumbers or qualified homeowners

Summary

Wausau requires a plumbing permit from the Plumbing Inspector before installing any plumbing or drainage work, under Wausau Municipal Code Section 19.12.010, and bars use of the plumbing until the Inspector has inspected and approved it. The City adopts Wisconsin Statutes Chapter 145 and Wisconsin Administrative Code SPS 325 and SPS 381-387 as the underlying plumbing code. Permit fees are non-refundable and the permit itself cannot be transferred.

No person shall install or cause to be installed any plumbing or drainage unless a permit therefor has been issued by the plumbing Inspector, and no plumbing shall be used until it has been inspected and approved by the Inspector. No permit fee shall be refunded and no permit shall be transferable.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12 Update 2).

Full Breakdown

Section 19.12.010 bars anyone from installing or causing to be installed any plumbing or drainage work without a permit issued by the Plumbing Inspector, and bars using that plumbing until the Inspector has inspected and approved it; the fee is never refunded and the permit cannot be transferred to another party or project. Section 19.12.020 lists what specifically triggers a permit: any clearwater drainage or plumbing work under Wisconsin Statutes Chapter 145, abandoning a water or sewer system ahead of a wrecking or moving permit, installing, replacing, or relocating a water conditioning unit or a domestic water heater, building a private water distribution system, connecting a dispensing or chemical-injection unit to a water line, a water-cooled air conditioner or humidifier connection, inside roof leaders or downspouts, a new or reconstructed sanitary sewer lateral or storm drain, a new or reconstructed water service extension, a sump pump or ejector, a subsoil or footing drain discharge point, and even replacing a plumbing fixture unless it goes back in the same location as the same fixture type. Licensed master plumbers and qualified homeowners under Wisconsin Statutes Chapter 145 may apply, and either can be prosecuted for skipping the permit before starting the job.

Section 19.04.010 makes Wisconsin Statutes Chapter 145 and Wisconsin Administrative Code SPS 325 and SPS 381-387 the plumbing code behind this title, with copies kept on file with the Plumbing Inspector at City Hall. Section 19.12.050 blocks a plumbing or sewer permit until a building permit has already issued, refuses one to anyone under an outstanding order from the electrical, building, or Plumbing Inspector, and triples the fee for work begun before a permit was obtained. Section 19.12.060 lets a permit lapse automatically after 60 days of inactivity without good cause, on cancellation of the required insurance, or on completion of the work it covered.

Violations & Fines

Installing plumbing or drainage without the Section 19.12.010 permit, or using it before the Plumbing Inspector's approval, exposes the plumber or homeowner to prosecution under Section 19.12.020(p), and starting work before a permit issues triples the fee under Section 19.12.050(c). A permit request will be refused outright if the applicant is under an outstanding compliance order from the electrical, building, or Plumbing Inspector, and paying the tripled fee does not excuse the underlying forfeiture exposure.

Frequently Asked Questions

Do I need a permit to replace a plumbing fixture in Wausau?
Most fixture swaps need one. Section 19.12.020(o) requires a permit to replace a plumbing fixture, with the single exception of a replacement installed in the same location as the same type of fixture it replaces.
Can a homeowner do their own plumbing work in Wausau?
Yes, Section 19.12.020(p) lets a qualified homeowner apply for a permit under Wisconsin Statutes Chapter 145, the same as a licensed master plumber, and both can be prosecuted if the job starts before the permit issues.
What plumbing code does Wausau enforce?
Section 19.04.010 adopts Wisconsin Statutes Chapter 145 along with Wisconsin Administrative Code SPS 325 and SPS 381-387 as the plumbing code for the City, and keeps copies on file with the Plumbing Inspector at City Hall.
Can I get a plumbing permit before my building permit is issued in Wausau?
No. Section 19.12.050 blocks issuance of a plumbing or sewer permit, other than water and sewer laterals for street improvements, until the Building Inspector has already issued the building permit for the project.

Sources & Official References

Other rules in Wausau

All Wausau rules

Compare Wausau to another location·View the Wisconsin building safety overview

Get notified when Plumbing Permits in Wausau, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.