Wayne, NJ Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Enforcing official
Plumbing Subcode Official, Division of Construction Code
Each plumbing fixture
$35
Water heater
$80
Gas or fuel oil piping
$35 per connection
Minimum plumbing fee
$75
Plan review
25% of the construction permit amount

Summary

In Wayne Township, New Jersey, plumbing work is permitted and priced under the Plumbing Subcode fee schedule in § 64-2 of the Township Code, enforced by the Plumbing Subcode Official in the Division of Construction Code. Fixtures cost $35 each, gas and fuel oil piping costs $35 per connection, and the minimum fee is $75.

(2) Plumbing Subcode fees. The plumbing subcode fees shall be as follows: (a) Plumbing fixtures. Type of Installation Fee Each new or replacement plumbing fixture $35 Dishwasher $25 Garbage disposal $25 Each stack $45 Backwater valve $75 Altering plumbing waste, vent, water piping $40 Hose bibbs $25 Sewer ejector $75 Water heater $80 ... (b) Gas or fuel oil piping fees for each connection: $35. ... (c) Minimum fee: $75.

Full Breakdown

The Plumbing Subcode Official is one of the positions the Township Council created in § 64-1 within the Division of Construction Code, which answers to the Construction Official. Section 64-2(A) requires the construction permit fee, which includes the plumbing subcode fee, to be paid before a permit can be issued.

The plumbing schedule in § 64-2(A)(2) prints a price for each item. Each new or replacement plumbing fixture is $35, a dishwasher or garbage disposal is $25, each stack is $45, a backwater valve is $75, altering plumbing waste, vent or water piping is $40, hose bibbs are $25, a sewer ejector is $75, a water heater is $80, floor drains are $30, and roof drains and storm outlets are $35. A water softener, grease trap interceptor, sand, oil and flammable liquid separator, backflow preventer for a lawn sprinkler system and pool drains are each $75. A building sewer from curb to building and a water service from curb to building are each $105, and a commercial grease tank is $210. An approved State of New Jersey potable water cross-connection is $175, with quarterly and annual backflow inspections at $75 per device.

Gas or fuel oil piping is $35 for each connection. The table prints $25 for a kitchen stove, oven, burner-type stove or clothes dryer, $80 for a boiler, furnace or pool heater, $35 for all other gas-fired equipment and $140 for a chimney liner. The plumbing minimum fee is $75.

Plan review adds 25% of the amount charged for the construction permit. Condominium and cooperative unit owners need homeowners' association certification before a plumbing permit issues for work causing exterior changes, where the bylaws require approval. Chapter 64 is a staffing and fee ordinance: it does not reprint a plumbing code.

Violations & Fines

Chapter 64 has no penalty clause of its own, so the general penalty in § 1-15.1 of the Wayne Township Code governs: on conviction, up to 90 days in the County Jail or other place of detention, a fine not exceeding $2,000, or community service not exceeding 90 days. Section 1-15.4 adds a further fine for a repeat offender convicted within one year.

Frequently Asked Questions

How much is a plumbing permit for a new water heater in Wayne Township?
The § 64-2(A)(2) schedule prints $80 for a water heater. Gas or fuel oil piping for the connection is a separate item at $35 for each connection, and the plumbing minimum fee is $75. The fee must be paid before the permit can be issued.
What does the township charge to replace a bathroom fixture?
Each new or replacement plumbing fixture is $35 under § 64-2(A)(2)(a). A stack is $45 and altering plumbing waste, vent or water piping is $40. The minimum fee for plumbing work is $75.
Are backflow devices inspected in Wayne?
Yes, the fee schedule lists them. A backflow water preventer for a lawn sprinkler system is $75, a quarterly inspection fee for backflow is $75, and an annual backflow fee is $75 per device. An approved State of New Jersey potable water cross-connection is $175.
Who reviews plumbing permit applications in Wayne Township?
The Plumbing Subcode Official, a position created in § 64-1 inside the Division of Construction Code. The Construction Official heads the Division and reports to the Department of Public Works. An on-site inspection agency may be retained by contract in place of a particular subcode inspector.

Sources & Official References

Other rules in Wayne

All Wayne rules

Compare Wayne to another location·View the New Jersey building safety overview

Get notified when Plumbing Permits in Wayne, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Passaic County handle plumbing permits.

Paterson, NJ
Some Restrictions