Key Facts
- Trigger
- Construction over 8 feet, within 10 feet of lot line
- Required protection
- Scaffolding and netting over full work area
- Excavation barrier
- 6 feet high if within 5 feet of street lot line
- Site fence
- 8-foot chain link, opaque fabric, gates every 50 feet
- Prohibited materials
- Barbed wire or razor wire fencing
Summary
Village Code § 7-1-2 modifies the adopted building code's pedestrian protection table so that any construction site more than 8 feet tall and within 10 feet of the lot line must run a system of scaffolding and netting over the full work area, not just a basic barrier or covered walkway.
SECTION 3306 - PROTECTION OF PEDESTRIANS TABLE 3306.1 PROTECTION OF PEDESTRIANS is modified to include the following: TABLE 3306.1 HEIGHT OF CONSTRUCTION More than 8 feet DISTANCE FROM CONSTRUCTION TO LOT LINE Less than 10 feet TYPE OF PROTECTION REQUIRED System of scaffolding and netting shall be provided to fully encompass all work areas at a level higher than the top of the barrier or covered walkway
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-9: Code current through: Ord. 26-159, passed - -2026).
Full Breakdown
1 of the adopted building code, Protection of Pedestrians, adding a Village-specific row: where the height of construction exceeds 8 feet and the distance from that construction to the lot line is less than 10 feet, the type of protection required is a system of scaffolding and netting that fully encompasses all work areas at a level higher than the top of the barrier or covered walkway below. The same amended Section 3306 also layers on site-fencing rules that apply alongside the scaffolding requirement. 9 requires any excavation, including trenches, within 5 feet of the street lot line to be enclosed with a barrier at least 6 feet high, and excavations set back further still need a barrier, chain link fence, or other measures approved by the building official whenever workers are not on site.
5. Barbed wire and razor wire are barred outright. Two exceptions ease the fencing rule, though not the scaffolding and netting requirement, for residential zoning districts under the Village's separate Zoning Ordinance: a 6-foot minimum fence height applies instead of 8 feet, and lockable double-leaf gates are not required.
Violations & Fines
Failing to erect the required scaffolding, netting, or site barrier is enforced as a building code violation. Absent a more specific penalty, Village Code § 1-1-5 applies a fine of $20 to $750, with each day of noncompliance treated as a separate offense, and the building official may also order the work stopped until protection is in place.
Frequently Asked Questions
When does Oak Park require scaffolding and netting on a construction site?
Is a construction fence also required?
Does this rule change in residential zoning districts?
What happens if a builder skips the required protection?
Sources & Official References
Other rules in Oak Park
Compare Oak Park to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Scaffold & Sidewalk Shed in Nearby Cities
How other cities in Cook County handle scaffold & sidewalk shed.