Lakewood, WA Building Setbacks & Zoning: Lot Coverage Limits (2026)
Key Facts
- Building coverage, R1-R3
- 45% of lot
- Building coverage, R4
- 50% of lot
- Building coverage, MF zones
- 60% of lot
- Impervious surface, R4
- 70% of lot
- Tree-preservation bonus
- +5% impervious, Director's discretion
- Coverage excludes
- Eaves, bay windows, balconies
Summary
Lakewood caps building coverage at 45 percent of the lot in the R1 through R3 single-family zones, 50 percent in R4, and up to 60 percent in the multifamily MF zones, under the LMC 18A.60.030(A) dimensional table. Impervious surface limits run separately and higher, up to 75 percent in MR2.
| | R1 | R2 | R3 | R4 | MR1 | MR2 | MF1 | MF2 | MF3 | ... | Building | 45% | 45% | 45% | 50% | 55% | 60% | 60% | 60% | 60% | | coverage | | | | | | | | | | | (B)(2) | | | | | | | | | | | Impervious | 45% | 45% | 60% | 70% | 70% | 75% | 70% | 70% | 70% | | surface | | | | | | | | | |
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 852, passed June 15, 2026).
Full Breakdown
030(A), sets two separate coverage ceilings for every residential zone: building coverage and impervious surface. Building coverage, the footprint of buildings and structures divided by lot area, is capped at 45 percent in R1, R2, and R3, rises to 50 percent in R4, and reaches 55 percent in MR1 and 60 percent in MR2 and all three MF zones. Impervious surface, which adds driveways, patios, and other hard surfacing to the building footprint, carries its own higher ceiling: 45 percent in R1 and R2, 60 percent in R3, and 70 to 75 percent in R4, the MR zones, and the MF zones.
030(B)(2)(d) defines lot coverage as the total area covered by buildings or structures divided by the site area, minus dedicated rights-of-way, and expressly excludes roof eaves, bay windows, balconies, and paved surfaces from the calculation. 030(B)(2)(a) through (c) applies where a lot uses the middle-housing density allowances added under the state's 2023 middle-housing law: 55 percent for a lot built out to six units, 50 percent for four or five units, and 45 percent for three units or fewer. 030(C)(2) to compensate for preserving a significant or heritage tree on the site, on top of any setback reduction granted for the same tree.
Violations & Fines
Exceeding the building coverage or impervious surface maximum is a code violation under LMC 1.44.010, typically caught at building permit review before construction begins. If coverage is added after the fact without a permit, the City may issue a stop-work order under LMC 1.44.030 and assess the general civil penalty of up to $500.00 per day under LMC 1.44.040 until the excess coverage is removed or approved.
Frequently Asked Questions
What percentage of my lot can a house cover in Lakewood?
Is impervious surface the same as building coverage?
Do roof eaves or balconies count toward lot coverage?
Can I get more impervious surface for keeping a big tree?
Sources & Official References
Other rules in Lakewood
Compare Lakewood to another location·View the Washington building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Lot Coverage Limits in Nearby Cities
How other cities in this county handle lot coverage limits.