Skip to main content
CityRuleLookup

Lauderhill, FL Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Base lot coverage limit
40% impervious surface (RS-4)
Absolute ceiling
65% even with a retention system
Design requirement
Sealed drawings by FL-registered architect/engineer
Storm design standard
25-year, 3-year storm event retention
Approval authority
City Engineer approval before building permit

Summary

In Lauderhill's RS-4 single-family zoning district, the Land Development Regulations cap impervious lot coverage at forty percent, with a hard ceiling of sixty-five percent even when a homeowner installs an on-site stormwater retention system to justify going beyond the base limit.

3.Lot coverage. The maximum impervious area lot coverage is forty (40) percent. The maximum lot coverage may be exceeded in cases where an on-site retention system is provided for any runoff generated by the impervious area which is in excess of the maximum allowed in the preceding table. In order to exceed the maximum lot coverage, sealed drawings which set forth the on-site drainage retention must be submitted by an architect, engineer or landscape architect registered in the State of Florida. The plans must be approved by the city engineer prior to the issuance of a building permit for the use which causes the need for the on-site retention system. The system must be designed to retain on-site the 25-year, 3-year storm event. In no case shall any lot exceed sixty-five (65) percent lot coverage even when an on-site drainage system is provided.

Full Breakdown

Section 3.1.1.F.3 of the Land Development Regulations sets the base lot-coverage standard for the Residential Single-Family at Four Dwelling Units Per Gross Acre (RS-4) district, Lauderhill's standard single-family zoning classification, at forty percent of the lot covered by impervious surface. A homeowner or builder who needs to exceed that base figure must submit sealed drawings from a Florida-registered architect, engineer or landscape architect showing an on-site retention system sized to hold the twenty-five-year, three-year storm event, and the City Engineer must approve those plans before a building permit issues for the work driving the need for extra retention.

Even with an approved retention system, Section 3.1.1.F.3 caps total lot coverage at sixty-five percent under any circumstance; there is no path to build beyond that ceiling. The same lot-coverage formula, and the same sixty-five percent hard cap, is reused with only minor numeric changes in Lauderhill's other single-family and multi-family districts, including RS-5, RS-4A and RM-22, each carried in its own Part 3.0 development-standards table under Article III. Enforcement of this and the district's other development standards falls to the Lauderhill Police Department, city inspectors and the Code Compliance Division under Section 1.7's general jurisdiction clause, the same mechanism that polices the district's setbacks and its thirty-five foot height limit.

Violations & Fines

Exceeding the forty percent lot-coverage limit without an approved on-site retention system, or building past the sixty-five percent absolute ceiling even with retention, is a violation the Chief Building Official and the Lauderhill Code Compliance Division can enforce by withholding or revoking a building permit and issuing a code enforcement citation; the property owner remains responsible for reducing impervious surface to come back into compliance.

Frequently Asked Questions

What is the maximum lot coverage allowed on an RS-4 lot in Lauderhill?
Forty percent of the lot may be covered with impervious surface under Section 3.1.1.F.3 of the Land Development Regulations, unless the owner adds an approved on-site stormwater retention system sized for the twenty-five-year, three-year storm event, which can raise the allowance.
Can lot coverage ever exceed sixty-five percent?
No. Section 3.1.1.F.3 sets sixty-five percent as an absolute ceiling in the RS-4 district; even a fully engineered on-site retention system approved by the City Engineer cannot push coverage past that figure.
Who has to sign off on the retention system drawings?
An architect, engineer or landscape architect registered in the State of Florida must seal the drawings, and the City Engineer must approve them before the Building Division issues a permit for the work that triggers the need for added retention.

Sources & Official References

Other rules in Lauderhill

All Lauderhill rules

Florida rules heatmap·Compare Lauderhill to another location·View the Florida building setbacks & zoning overview

Get notified when Lot Coverage Limits in Lauderhill, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Lot Coverage Limits in Nearby Cities

How other cities in Broward County handle lot coverage limits.

Hollywood, FL
Some Restrictions
Pembroke Pines, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions
Miramar, FL
Some Restrictions