Skip to main content
CityRuleLookup

North Hempstead, NY Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

R-AAA lot coverage cap
15% of lot area (§ 70-8)
Front-yard paving cap
30% impervious (§ 70-12.5)
R-AAA minimum lot size
20,000 sq. ft.
Last amended
12-14-1999, L.L. No. 14-1999
Over-cap penalty (first offense)
Up to $1,000 fine
Enforced by
Building Department / BZA

Summary

In North Hempstead's Residence AAA District, the Town's most common single-family zone, all buildings and structures on a lot together cannot cover more than 15% of the lot area under Zoning Code Section 70-8. A companion rule caps front-yard paving separately at 30% of that yard's area to control stormwater runoff.

§ 70-8. Lot coverage. [Amended 12-14-1999 by L.L. No. 14-1999] The lot coverage shall not exceed 15% of the lot area. ... § 70-12.5. Front yard paving. [Added 12-14-1999 by L.L. No. 14-1999] For all new construction, alterations or landscaping changes, a front yard may not be covered more than 30% by any impervious material or other type of paving. Water flow from paved areas must be controlled to alleviate excessive runoff onto adjacent properties.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4892187; v82 updated 2026-04-21; through 04-21-2026).

Full Breakdown

L. No. ' Lot coverage counts the footprint of the house together with garages, sheds and other accessory buildings or structures. 6B. 5 imposes a second, narrower coverage limit specific to the front yard: for any new construction, alteration, or landscaping change, the front yard 'may not be covered more than 30% by any impervious material or other type of paving,' and water flowing off any paved area must be controlled so it doesn't run onto adjacent properties. 4. Homeowners planning an addition, pool deck, or expanded driveway need to check both limits, the 15% whole-lot cap on buildings and structures and the 30% front-yard paving cap, since either one can force a redesign even when the other is satisfied.

The Building Department reviews lot coverage at the building-permit stage, and construction that would push a lot over 15% coverage cannot be permitted as of right; it requires a redesign or a variance from the Board of Zoning and Appeals.

Violations & Fines

Exceeding the 15% lot-coverage cap or the 30% front-yard paving limit without Board of Zoning and Appeals relief falls under the catch-all penalty in Section 70-235K: a fine of up to $1,000 for a first offense, $1,000 to $2,500 for a second offense within five years, and $2,500 to $10,000 for a third, plus up to 15 days' imprisonment, with each week the excess coverage remains counted as a separate violation.

Frequently Asked Questions

What is the maximum lot coverage in North Hempstead's R-AAA district?
Section 70-8 caps total lot coverage, meaning the house plus garages, sheds and other structures, at 15% of the lot area in the Residence AAA District, the Town's standard single-family zone with a 20,000-square-foot minimum lot size.
Does the 15% limit include my driveway or patio?
The 15% figure in Section 70-8 covers buildings and structures. Paved surfaces in the front yard are governed separately by Section 70-12.5, which caps impervious paving there at 30% of the front yard's area and requires runoff control.
What happens if my addition pushes my lot over the coverage limit?
The Building Department can't issue a permit as of right once you exceed the 15% cap in Section 70-8; you'd need to redesign the project or apply to the Board of Zoning and Appeals for a variance before construction can proceed.
Is 15% the lot-coverage limit in every North Hempstead zoning district?
It's the figure for R-AAA under Section 70-8 and matches the Residential Open Space District's cap under Section 70-3.6A, but other residence and business districts in Chapter 70 set their own separate percentages, so check the section for your specific district.

Sources & Official References

Other rules in North Hempstead

All North Hempstead rules

New York rules heatmap·Compare North Hempstead to another location·View the New York building setbacks & zoning overview

Get notified when Lot Coverage Limits in North Hempstead, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.