Data Centers & Crypto Mining in Acworth, GA (2026)
3 verified data centers & crypto mining rules for Acworth, Georgia, sourced directly from the municipal code and official government pages.
Verified from official government sources
Data Center Zoning & Siting
Acworth's Use Table permits crypto mining operations, server farms, and data centers in exactly one zoning district, Heavy Industrial (HI), and even there only as a Special Use requiring Mayor and Board of Aldermen approval. Every residential, commercial, office, and Light Industrial column in the table shows the use as flatly not permitted.
Acworth Confines Data Centers To Heavy Industrial
Significant RestrictionsAcworth Code of Ordinances, Appendix B (Zoning Ordinance) § 73-4.4 Use Table; § 73-5.11(D)(3)
INDUSTRIAL R-1 R-2 R-3 R-5 RM-6 RM-8 C-1 C-2 OP L1 HI ... crypto mining, server farms, data centers — — — — — — — — — — S ... D.Special Uses Permitted by Board of Aldermen.1. ... Adult Entertainment.2.Extended Stay Facilities.3. ... Cryptocurrency mining operations, server farms, and/or data centers.
Data Center Noise Limits
Acworth's Zoning Ordinance bars a cryptocurrency mining operation, server farm, or data center from producing more than 90 decibels measured 25 feet from the outside of its containment structure. The limit sits in the same nuisance-abatement subsection that bars any adverse effect diminishing neighbors' quality of life or raising their costs.
Acworth Caps Data Center Noise At 90 dB
Some RestrictionsAcworth Code of Ordinances, Appendix B (Zoning Ordinance) § 73-7.4.3(C)
C.Nuisance Abatement.1.No adverse or detrimental effects shall impact adjoining properties, owners, or residents that diminish the quality of life or increase the costs of serving their business or maintaining their homes.2.A noise level exceeding ninety decibels (90 dB) from a distance of twenty-five feet from the exterior of the containment structure is prohibited.
Crypto Mining Rules
Acworth's Zoning Ordinance sets hard technical standards for cryptocurrency mining operations, server farms, and data centers: an active clean-agent fire suppression system, a 30-minute fire-rated metal containment structure, and a 120-degree Fahrenheit ceiling on containment-space temperature, with entry barred above 90 degrees. The rules sit in Section 73-7.4.3 alongside the use's Heavy Industrial-only siting limit.
Acworth Data Center Fire And Heat Rules
Some RestrictionsAcworth Code of Ordinances, Appendix B (Zoning Ordinance) § 73-7.4.3(A), (B)
A.Fire Safety Requirements.1.Fire Suppression. An active clean agent fire protection system shall be provided and maintained in good working order within any structure. High sensitivity smoke detectors shall be installed and operational in order to activate this clean agent fire suppression system. ... 3.Containment Space. The equipment used shall be housed in an individually metered, electrica...
Looking for Cobb County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Acworth city rules.
Data Centers & Crypto Mining in Cobb County →