Skip to main content
CityRuleLookup

Environmental Rules in Lee's Summit, MO (2026)

4 verified environmental rules for Lee's Summit, Missouri, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Lee's Summit requires a City land disturbance permit for any site clearing more than 2,000 square feet of ground. Fees run $200 to $1,400 by acreage, and sites over one acre also need a Missouri DNR permit.

Lee's Summit Stormwater & Land Disturbance Rules

Some Restrictions

City of Lee's Summit, Land Disturbance Permit (Code § 22.5-3; Design & Construction Manual)

An erosion and sediment control plan, which must pass City review

Erosion Control

Any land disturbance in Lee's Summit that could carry sediment off-site needs a land disturbance permit, and the City Engineer's staff enforce erosion control on every job site under Chapter 22.5. Inspectors who find deficient controls can halt inspections, issue a stop-work order, suspend the permit, and bill the contractor for City-performed repairs.

Lee's Summit Erosion & Sediment Control Permits

Some Restrictions

Lee's Summit, MO, Code of Ordinances Sec. 22.5-3 (Enforcement of chapter—City Engineer)

Enforcement of erosion and sediment control.1.The Department of Public Works and the Department of Codes Administration shall handle erosion control enforcement through the normal routine activities that include inspecting the site, communicating with the contractor, developer, or owner, and issuing written warnings to the contractor, developer, or owner to resolve issues of non-compliance. If ...

Flood Zones

Lee's Summit requires a floodplain development permit for any construction inside the numbered and unnumbered A and AE zones on Jackson County's flood insurance rate maps, administered by the City Engineer as Floodplain Administrator, with violations a misdemeanor carrying up to a $500 fine plus costs for each day the violation continues.

Lee's Summit Floodplain Development Permit Rules

Significant Restrictions

Lee's Summit, MO, Unified Development Ordinance Sec. 5.140 (General Provisions, Floodplain Overlay District)

A.Land to which ordinance applies. This division shall apply to all lands within the jurisdiction of the City identified as numbered and unnumbered A zones and AE zones on the flood insurance rate map (FIRM) for Jackson County on map panels 29095C0294G...29095C0553G, dated January 20, 2017 as amended, and any future revisions thereto. In all areas covered by this division, no development shall ...

Flood Elevation Requirements

In mapped special flood hazard areas with published base flood elevations, Lee's Summit requires new and substantially improved homes and commercial buildings to elevate the lowest floor, including the basement and all mechanical equipment, to two feet above the base flood elevation, a two-foot freeboard margin above FEMA's minimum.

Lee's Summit Base Flood Elevation Freeboard Rule

Some Restrictions

Lee's Summit, MO, Unified Development Ordinance Sec. 5.170(B)(1)(a)-(b) (Standards for Flood Hazard Reduction)

a.Residential construction: New construction or substantial-improvement of any residential structures, including manufactured homes, shall have the lowest floor, including basement and all mechanical, electrical, and/or other utility equipment, elevated to two feet above the base flood elevation.b.Non-residential construction: New construction or substantial-improvement of any commercial, indus...

Looking for Jackson County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Lee's Summit city rules.

Environmental Rules in Jackson County