Environmental Rules in Midwest City, OK (2026)
4 verified environmental rules for Midwest City, Oklahoma, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Midwest City bills every developed property a monthly stormwater charge, at least $2.42 per equivalent service unit, to fund drainage system operations, NPDES compliance, and flood-control projects citywide.
Midwest City Stormwater Utility Fee
Some RestrictionsMidwest City Code of Ordinances § 43-404
There shall be and there is hereby established a stormwater charge which shall be billed monthly with the other city utilities. The stormwater charge shall be a minimum of two dollars and forty-two cents ($2.42) per month per account. ... One (1) ESU shall be defined as two thousand eight hundred sixty square feet (2,860 ft²) of impervious area.
Erosion Control
Midwest City requires a land disturbing permit before grading, clearing or excavation on most sites, with an erosion and sediment control plan reviewed by the stormwater manager.
Midwest City Land Disturbing Permit
Some RestrictionsMidwest City Code of Ordinances § 43-437
It shall be unlawful for any person to conduct, or permit to be conducted, any land disturbing activity upon any land without a land disturbing permit issued under this article. Such permit shall be required in addition to any building permit or other permit required by this Code for the site...
Flood Zones
Midwest City requires a floodplain development permit before any construction or land alteration in areas of special flood hazard, with new and substantially improved structures elevated one foot above base flood elevation.
Midwest City Floodplain Development Permit Rules
Some RestrictionsMidwest City Code of Ordinances §§ 13-23, 13-24
A floodplain development permit shall be required to ensure conformance with the provisions of this article. (Ord. No. 2604, § 1, 6-13-95) Sec. 13-24. - Compliance. No person shall locate, alter or change the use of any structure or land, shall do so without full compliance with the terms of this article and other applicable regulations. Any person in violation of this article shall be g...
Flood Elevation Requirements
Midwest City requires new and substantially improved residential structures in FEMA-mapped special flood hazard areas to elevate the lowest floor one foot above the base flood elevation, a one-foot freeboard margin above FEMA's bare minimum.
Midwest City Flood Elevation Freeboard Rule
Some RestrictionsMidwest City Code of Ordinances § 13-52(1)
(1)Residential construction. New construction and substantial improvement of any residential structure shall have the lowest floor (including basement), elevated to one (1) foot above the base flood elevation. A registered professional engineer, architect, or land surveyor shall submit a certification to the floodplain administrator that the standard of this subsection as proposed in section 13...