Building Safety in Midwest City, OK (2026)

6 verified building safety rules for Midwest City, Oklahoma, sourced directly from the municipal code and official government pages.

Verified from official government sources

Childcare Center Rules

Midwest City requires every licensed child care center and adult day care center to comply with the city's zoning, sanitation, building, electrical, fire prevention and housing codes, and to eliminate fire and explosion hazards on the premises.

Midwest City Child Care Center Building Rules

Some Restrictions

Midwest City Code of Ordinances § 10-36

Every child care center or adult day care center licensed under this chapter, except for a family child care home or a large family child care home, shall conform to applicable codes and ordinances of the city, including, but not limited to, zoning, sanitation, building, electrical, fire prevention and housing. In addition, the premises shall be free from fire hazards and shall have adequate pr...

Carbon Monoxide Detectors

Midwest City requires short-term rental owners to install and maintain sufficient carbon monoxide detectors based on the property's square footage as a condition of getting or renewing a rental license.

Midwest City Short-Term Rental CO Detectors

Some Restrictions

Midwest City Code of Ordinances § 20-206(b)(9)

Has sufficient number of operational smoke detectors and carbon monoxide detectors based on the square footage of the short-term rental as required by the building code and appropriate number and location of fire extinguishers based on the square footage of the short-term rental as required by the fire code;

Building Permits

Contractors must call for a city inspection when rough-in or alteration work is done, and the inspector posts a signed approval notice once the work passes.

Midwest City Building Permit Inspections

Some Restrictions

Midwest City Code of Ordinances § 9-87

When an original rough-in installation of a building system is completed on any premises, the permit-holding contractor shall notify the inspector that the work is ready for inspection. The inspector shall make an inspection of the alteration or installation at the first available time. If the installation or alteration to the building system has been done in accordance with the terms and provi...

Electrical Permits

Midwest City has adopted the 2020 National Electrical Code as modified by the state and requires a separate permit for each structure before any electrical system is installed, altered, repaired or replaced.

Midwest City Electrical Permit & 2020 NEC

Some Restrictions

Midwest City Code of Ordinances § 9-153

No electrical system regulated by this Code shall be installed, altered, repaired, replaced or remodeled unless a separate electrical permit for each structure has first been obtained from the city. Except as otherwise provided, no permit shall be issued to anyone other than a licensed electrical contractor.

Plumbing Permits

Midwest City requires a separate plumbing permit for every structure before installation, alteration, repair, replacement or remodeling of any regulated plumbing system, issued only to licensed plumbing contractors under the adopted International Plumbing Code.

Midwest City Plumbing Permit Required

Some Restrictions

Midwest City Code of Ordinances § 9-339

No plumbing system regulated by this Code shall be installed, altered, repaired, replaced or remodeled unless a separate plumbing permit for each structure has first been obtained from the city. Except as otherwise provided, no permit shall be issued to anyone other than a licensed plumbing contractor.

Building Inspections

Midwest City requires the permit-holding contractor to notify the building inspector once rough-in work or a permitted alteration is ready, and the inspector examines it at the first available time and posts a signed approval notice on site.

Midwest City Building Inspection and Approval

Some Restrictions

Midwest City Code of Ordinances § 9-87

When an original rough-in installation of a building system is completed on any premises, the permit-holding contractor shall notify the inspector that the work is ready for inspection. When an alteration to the building for which a permit is required under the terms of this article is completed on any premises, the permit-holding contractor shall notify the inspector that the work is ready for...