Skip to main content
CityRuleLookup

Building Safety in Taylorsville, UT (2026)

5 verified building safety rules for Taylorsville, Utah, sourced directly from the municipal code and official government pages.

Verified from official government sources

Childcare Center Rules

In Taylorsville City, running a residential child day care, preschool, or children's instruction business out of a home requires a home occupation license, and every adult connected to the operation must clear a BCI background check within 60 days of applying. Convicted felons and certain misdemeanants are barred outright from providing care.

Taylorsville Home Child Care License Rules

Significant Restrictions

Taylorsville City Code § 5.54.050

Each person requesting a new home occupation license or a renewal to operate a residential child day care, residential preschool. or residential instruction under this section shall submit to the department the following information in addition to all required fees, applications, and forms: BCI background check issued within 60 days of submitting the application for all applicants, owners, dire...

Carbon Monoxide Detectors

Accessory dwelling units in Taylorsville must have interconnected smoke and carbon monoxide detectors before occupancy, per Taylorsville City Code § 13.11.010(B)(11)(h), which ties the requirement to International Residential Code sections 314.2.2 and 315.2.2. The detectors are one of the mandatory construction standards a building permit must cover, alongside fire-rated separation walls and emergency escape windows, before the ADU can receive the business license required for occupancy.

Taylorsville ADU Carbon Monoxide Detector Rule

Some Restrictions

Taylorsville City Code § 13.11.010(B)(11)(h)

11. A building permit is required for the installation of any of the features listed below and any other construction related to the ADU. All construction must meet current building codes and shall, at a minimum, comply with the following standards prior to receiving a business license: ... ... h. Provide interconnected smoke and carbon monoxide detectors. (IRC 314.2.2 & 315.2.2)

Building Permits

Taylorsville Code section 15.08.040 bars any utility company from connecting service to a building or wiring that needs a permit until the building official signs off, and section 15.08.050 keeps permits issued before January 1, 2002 governed by the codes in force on their issue date.

Taylorsville Building Permit Enforcement Rules

Some Restrictions

Taylorsville City Code §§ 15.08.040, 15.08.050, 1.08.020

It shall be unlawful for any utility company to provide service to any structure or building, or to service equipment or wiring for which a permit is required, until approval is granted by the building official. The building official may order utility services terminated at any location where the use is not authorized or is in violation of the building, zoning, or other ordinances of the city. ...

Electrical Permits

Taylorsville does not print its own electrical code; section 15.08.010 adopts the National Electric Code edition Utah currently has in force as the city's construction standard for electrical work, and violating it carries the same misdemeanor penalty as any other title 15 building code violation.

Taylorsville Adopted National Electric Code

Some Restrictions

Taylorsville City Code §§ 15.08.010, 1.08.020

The city of Taylorsville adopts by reference the edition of the international building code and national electric code as currently adopted by the state of Utah as the construction standards to be applied to building construction, alteration, remodeling, and repair, and in the regulation of building construction, alteration, remodeling and repair. ... When no other penalty is prescribed, any pe...

Plumbing Permits

Taylorsville folds plumbing work into its building permit fee structure rather than charging for it separately: section 15.08.030 waives plumbing subpermit fees when the work is done alongside a paid building permit, but requires a full building permit once two or more subpermits, such as plumbing and electrical together, are needed on the same job.

Taylorsville Plumbing Subpermit Fee Rules

Some Restrictions

Taylorsville City Code §§ 15.08.030, 1.08.020

Plumbing, electrical, and mechanical fees shall not be assessed when such permits are issued in conjunction with a building permit for which required fees have been paid. If two (2) or more subpermits are received, a building permit must be taken out. If only one subpermit is required, and no other work is to be done, fees shall be assessed in accordance with the consolidated fee schedule as ad...

Looking for Salt Lake County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Taylorsville city rules.

Building Safety in Salt Lake County →