Environmental Rules in Texas City, TX (2026)
4 verified environmental rules for Texas City, Texas, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
In Texas City, Texas, nothing except storm water may enter the municipal separate storm sewer system, and Chapter 158 lists banned substances from motor oil to concrete washout. Violations are misdemeanors carrying a fine of not less than $250 and not more than $2,000 for each violation, with each day a separate offense.
Texas City Storm Water Discharge Rules
Some RestrictionsTexas City Code of Ordinances §§ 158.20, 158.21
(A) No person shall introduce or cause to be introduced into the municipal separate storm sewer system (MS4) any discharge that is not composed entirely of storm water. ... (B) No person shall introduce or cause to be introduced into the MS4 any discharge that causes or contributes to causing the city to violate their TPDES permit. (C) No person shall dump, spill, leak, pump, pour, emit, empty,...
Erosion Control
In Texas City, Texas, every construction site operator must use best management practices to keep sediment out of the MS4, inspect disturbed areas at least once every 14 calendar days and within 24 hours after a storm of one-half inch or more, and file a notice of intent seven days before starting one-acre disturbances.
Texas City Construction Erosion and Sediment Control
Some RestrictionsTexas City Code of Ordinances § 158.23
(A) General requirements. (1) All operators of construction sites shall use best management practices to control and reduce the discharge, to the MS4 and to waters of the United States, of sediment, silt, earth, soil and other material associated with the clearing, grading, excavation and other construction activities to the maximum extent practicable. ... (2) Qualified personnel (provided by t...
Flood Zones
In Texas City, Texas, Chapter 157 of the City Code applies to every area of special flood hazard inside the city limits, and nobody may build, alter or change the use of a structure or land there without a development permit from the Floodplain Administrator, who is the Chief Building Official.
Texas City Flood Hazard Area Development Rules
Some RestrictionsTexas City Code of Ordinances §§ 157.06-157.09
This chapter shall apply to all areas of special flood hazard within the jurisdiction of the city. ... The areas of special flood hazard identified by the Federal Emergency Management Agency in a scientific and engineering report entitled “The Flood Insurance Study for the City of Texas City, Texas”, dated 11-2-1982, with accompanying flood insurance rate maps and flood boundary-floodway maps (...
Flood Elevation Requirements
In Texas City, Texas, new homes and substantial improvements in a mapped flood hazard area must have the lowest floor, including basement, at or above the base flood elevation, and outside those areas new construction must reach seven feet mean sea level or 18 inches above the street curb, whichever is greater.
Texas City Base Flood Elevation Requirements
Some RestrictionsTexas City Code of Ordinances §§ 157.40(H), 157.41
(H) All new construction or any substantial improvement located in a non- special flood hazard shall be constructed at seven feet mean sea level or 18 inches above the curb of the street, whichever is greater. ... In all areas of special flood hazard where base flood elevation data has been provided as set forth in §§ 157.07, 157.25(B) or 157.42 of this chapter, the following provisions are req...
Looking for Galveston County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Texas City city rules.
Environmental Rules in Galveston County →