Key Facts

Pre-occupancy requirement
utility capacity + electrical inspection letters
Structure fire rating
resist internal fire 30+ minutes
Container stacking height
max 9 feet
Abandonment trigger
12 continuous months idle
Removal deadline after notice
3 months, or county removes + liens

Summary

In unincorporated Bulloch County, a commercial cryptocurrency mining operation must prove the electrical grid can absorb its load, meet fire-rated structural standards, and gets flagged as legally abandoned, with mandatory removal, after 12 straight months of nonuse.

These county ordinances apply to unincorporated areas of Bulloch County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Section 1415. - Commercial cryptocurrency mining operation. ... (c)All principal and accessory structures used for cryptocurrency mining operations, server farms, and/or data centers, shall be arranged, designed and constructed to be harmonious and compatible with the site and with the surrounding properties. ... (k)The equipment used in any commercial cryptocurrency mining operation shall be housed in a metered electrically grounded and pre-engineered metal-encased structure with a fire rating designed to resist an internal electrical fire for at least 30 minutes. The containment space shall contain baffles that will automatically close in the event of fire independent of a possible electric system failure. ... (q)Any commercial cryptocurrency mining operation that is not operated for a continuous period of 12 months and for which there are no applications pending for permitted use of the structure at the end of such 12-month period, shall be considered abandoned, whether or not the owner or operator intends to make use of the device(s).

Full Breakdown

Section 1415 of the Zoning Ordinance (Appendix C) sets detailed siting and construction standards for commercial cryptocurrency mining operations, server farms and data centers. Before a certificate of completion or occupancy issues, the applicant must provide written verification from the electrical service provider that supply lines and substation capacity can serve the county's other projected load growth, that utility equipment can safely handle the operation, and that the use will not cause electrical interference or line-voltage fluctuations on or off site; the applicant must also show the electrical work passed a third-party final inspection.

Structures must be harmonious with the site and surroundings; if pre-fabricated, pre-engineered or modular buildings are used they need concrete foundations and muted earth-tone exterior facades that are not defective, decayed or corroded, and any intermodal shipping containers must meet the Georgia Department of Community Affairs' Industrialized Building Rules and Bulletins. Mining equipment must sit in a metered, electrically grounded, pre-engineered metal-encased structure rated to resist an internal electrical fire for at least 30 minutes, with baffles that automatically close in a fire independent of the electrical system.

Stacked shipping-container housing cannot exceed nine feet in height, and each site needs 24-hour emergency contact signage with the operator's name, phone number and the local power company's contact. An operation idle for a continuous 12 months with no pending permit applications is deemed abandoned; the owner must remove the facility within three months of notice from the county or the county may remove it and lien the property for the cost.

Violations & Fines

Operating without the required utility capacity verification and third-party electrical inspection, using non-conforming structures, or failing to remove an abandoned facility within three months of county notice under Section 1415(q) triggers county removal with a lien on the property for removal costs, and is otherwise enforced as a Zoning Ordinance violation under Section 418 with each day a separate offense.

Frequently Asked Questions

What must a crypto mining operator prove before opening in Bulloch County?
Section 1415(a) requires written verification from the electrical utility that grid capacity is adequate, equipment can handle the load safely, and the operation will not cause voltage fluctuations, plus proof the electrical work passed a third-party inspection.
When is a crypto mining facility considered abandoned?
After a continuous 12-month period without operation and with no pending permit applications, per Section 1415(q). The owner then has up to three months after county notice to remove it before the county can do so and place a lien for the cost.
How tall can stacked shipping-container mining structures be?
Section 1415(m) caps vertically combined cargo or ISO shipping containers used for housing mining equipment at nine feet in height.

Sources & Official References

Other rules in Bulloch County

All Bulloch County rules

Compare Bulloch County to another location·View the Georgia data centers & crypto mining overview

Get notified when Crypto Mining Rules in Bulloch County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.