Key Facts

Daytime limit
50 dBA continuous
Nighttime limit
45 dBA continuous
Measurement interval
15-minute Leq, slow weighting
Measurement distance
no closer than 100 ft from residence
Pure-tone tolerance
5-15 dB by frequency band

Summary

In unincorporated Bulloch County, crypto mining and data center operators cannot exceed 50 dBA in the daytime or 45 dBA at night at a nearby residence, measured with a calibrated Type 1 sound meter no closer than 100 feet from the home.

These county ordinances apply to unincorporated areas of Bulloch County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Section 1415. - Commercial cryptocurrency mining operation. ... (d)The operations shall not cause the dissemination of vibration or noise in excess of the maximum environmental noise level established by Bulloch County Code of Ordinances chapter 10, article VI. The operators shall not cause, allow, or permit the operation of any source of sound which creates at an occupied residential building or defined sensitive receiver, as may exist at the time of the issuance of a certificate of completion or occupancy, a sound level that exceeds a daytime continuous sound level of 50 dBA or a nighttime continuous sound level of 45 dBA, for any 15-minute measurement interval unless otherwise permitted. ... (f)For permitting and compliance purposes, measurements shall be performed using a calibrated Type 1 sound level meter, configured to log and record one-third octave flat-weighted equivalent sound pressure levels, and A-weighted equivalent level (Leq), slow time weighting, with a 15-minute averaging interval. Measurements shall be made proximate to, but no closer than, 100 feet from an occupied residential structure or other designated sensitive receiver.

Full Breakdown

Section 1415(d) through (j) of the Zoning Ordinance (Appendix C) sets the noise standard for commercial cryptocurrency mining operations, server farms and data centers, cross-referencing the county's general environmental noise limit in Chapter 10, Article VI. At an occupied residential building or other defined sensitive receiver existing when the certificate of occupancy issued, the operation cannot produce a continuous sound level exceeding 50 dBA in the daytime or 45 dBA at night, measured over any 15-minute interval. A separate pure-tone standard applies: a one-third octave band cannot exceed the arithmetic average of the two adjacent bands by 5 dB at 500 hertz and above, 8 dB between 160 and 400 hertz, or 15 dB at 125 hertz and below.

Measurements must use a calibrated Type 1 sound level meter logging one-third octave flat-weighted and A-weighted equivalent (Leq) levels with slow time weighting and a 15-minute averaging interval, taken no closer than 100 feet from the residence or sensitive receiver, with transient background noise excluded. Before occupancy, the applicant must submit a noise test report from a qualified acoustical professional, and the zoning administrator can require a noise barrier if tests fail to conform. These limits do not protect a residence built after the mining facility's certificate of occupancy issued.

Violations & Fines

Exceeding the 50 dBA daytime or 45 dBA nighttime continuous sound limit, or the pure-tone decibel thresholds, at an existing residence or sensitive receiver is a Section 1415 standards violation enforced as a Zoning Ordinance violation under Section 418, with the zoning administrator able to require a noise reduction barrier and each day of noncompliance a separate offense.

Frequently Asked Questions

What is the noise limit for a data center or crypto mining facility near homes in Bulloch County?
Section 1415(d) caps continuous sound at an existing residence or sensitive receiver at 50 dBA in the daytime and 45 dBA at night, measured over any 15-minute interval.
How is data center noise measured for compliance?
Section 1415(f) requires a calibrated Type 1 sound level meter logging one-third octave and A-weighted Leq levels with slow time weighting over a 15-minute average, taken no closer than 100 feet from the residence, with transient background sounds excluded.
Does the noise limit protect a house built after the facility opened?
No. Section 1415(j) states the noise limitations do not apply to any residential or sensitive receiver established after the certificate of completion or occupancy was issued for the mining or data center operation.

Sources & Official References

Other rules in Bulloch County

All Bulloch County rules

Compare Bulloch County to another location·View the Georgia data centers & crypto mining overview

Get notified when Data Center Noise Limits in Bulloch County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.