Apple Valley, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing code
CBC 2025 Appendix J, adopted § 8.12.010
Slope protection deadline
Before final grading approval
Wind erosion plan
Required before permit issuance
Water erosion plan
Required for any grading
Clearing permit trigger
Vacant lot or lot over 0.5 acre
Engineered grading threshold
Over 5,000 cubic yards
Enforcement
Building Official, Title 1 penalties

Summary

Apple Valley's grading code, Appendix J of the 2025 California Building Code adopted by Chapter 8.12, requires cut and fill slopes to be protected against erosion and makes both a written wind erosion control plan and a written water erosion control plan conditions of grading. The Building Official can demand extra measures anytime erosion keeps occurring on an active site.

SECTION J110 Erosion Control. Section J110.1.1. Slopes. The faces of cut and fill slopes shall be prepared and maintained to control against erosion. This control may consist of effective planting. The protection for the slopes shall be installed as soon as practicable and prior to calling for final approval. Where cut slopes are not subject to erosion due to the erosion resistant character of the materials, such protection may be omitted. ... Section J110.1.2.2. Wind Erosion Control Plans Required. A written wind erosion control plan shall be submitted to the Building Official for approval prior to the issuance of a grading permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 19 Update 1).

Full Breakdown

1 requires the faces of cut and fill slopes to be prepared and maintained to control against erosion, allows effective planting to satisfy that duty, and requires protection to be installed as soon as practicable and before final approval is called for; slopes cut into erosion-resistant material can skip the requirement. 2 requires a written wind erosion control plan submitted to and approved by the Building Official before a grading permit issues, using at least one of: phasing grading in small tracts to limit exposed bare ground, keeping water trucks on site for regular use, approved chemical additives to stabilize the soil crust, or hydroseeding; the Building Official can order additional measures anytime the plan is not preventing wind erosion.

3 separately requires a written water erosion control plan for any grading performed, kept in place for active projects and, at the Building Official's discretion, for previously graded sites. Grading over 5,000 cubic yards, or grading meant to support a structure, must be designated 'engineered grading' under an approved plan from a Civil Engineer (Section J104). 1 requires a separate clearing permit to clear or grub a vacant lot, or a developed lot over half an acre, unless a grading permit already covers the work, unless vegetation removal is ordered by the Fire Protection District or Flood Control District and done by mowing, or unless the work serves a bona fide agricultural operation.

Violations & Fines

Grading, clearing or building work performed without the required erosion-control plans or without the underlying grading or clearing permit falls under Title 8's general enforcement scheme: Section 8.10.120 treats unlawful construction as a public nuisance the Town Attorney can sue to abate, and violations are punished as an infraction or misdemeanor under Sections 1.01.200 through 1.01.230 of Title 1.

Frequently Asked Questions

Does Apple Valley require an erosion control plan before grading?
Yes. Section J110.1.2.2 requires a written wind erosion control plan submitted to and approved by the Building Official before a grading permit is issued, and Section J110.2.3 separately requires a written water erosion control plan for any grading performed.
What measures satisfy the wind erosion plan?
Section J110.1.2.2 lists acceptable measures: grading tracts in small phases to limit exposed bare ground, keeping water trucks on site for regular use, applying approved chemical additives to stabilize the soil crust, or hydroseeding. The plan must use at least one of these.
Do I need a permit just to clear brush from a vacant lot?
Yes. Section J113.1 requires a clearing permit to clear or grub a vacant lot or any developed lot over half an acre, unless a grading permit already covers the work, the vegetation removal is ordered by the Fire Protection District or Flood Control District, or the clearing serves a bona fide agricultural operation.

Sources & Official References

Other rules in Apple Valley

All Apple Valley rules

California rules heatmap·Compare Apple Valley to another location·View the California environmental rules overview

Get notified when Erosion Control in Apple Valley, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in San Bernardino County handle erosion control.

Fontana, CA
Some Restrictions
Hesperia, CA
Some Restrictions
Rancho Cucamonga, CA
Some Restrictions
Victorville, CA
Some Restrictions
Rialto, CA
Some Restrictions
Chino, CA
Some Restrictions
San Bernardino, CA
Significant Restrictions