- Peak runoff reduction required
- 10% below pre-development
- Design storm standard
- 100-year, 1-hour event
- On-site capture requirement
- 100% retention/infiltration
- Basin depth limit (under 1 acre)
- 4 ft
- Basin depth limit (1 acre or more)
- 8 ft
- Max basin slope
- 4:1
- Infiltration deadline
- 72 hours
Summary
New residential development in Apple Valley must cut peak storm runoff at least 10% below pre-development levels and capture 100% of a 100-year, one-hour storm on site, with retention basin depth, slope and drainage rules set by Development Code Section 9.28.100.
A.Peak storm water pass-through runoff from a property proposed for development shall be at least 10% less than what the runoff was from the property prior to development, or as determined by the Town Engineer. ... B.All proposed development shall capture, retain and infiltrate 100% of a 100-year one (1) hour storm event that falls on the site, or as determined by the Town Engineer. ... G.Retention/detention basins less than one (1) acre in size shall not be greater than four (4) feet in depth, unless otherwise approved by the Planning Commission under a Development Permit or other applicable land entitlement. H.Retention/detention basins greater than one (1) acre in size shall not be greater than eight (8) feet in depth, unless otherwise approved by the Planning Commission under a Development Permit or other applicable land entitlement. ... N.All retention basins shall include dry wells or other approved devices, to help facilitate the rapid removal of storm water, and be able to infiltrate the design volume within seventy-two (72) hours of the conclusion of a rainfall event.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 19 Update 1).
Full Breakdown
100, Drainage Facilities and Storm Water Runoff, governs how new residential projects manage rainfall inside town limits. Obstructing, diverting, bridging or confining a natural drainage channel in a way that damages other properties is prohibited outright. For projects that go forward, peak storm water pass-through runoff after development must be at least 10% less than the pre-development runoff, calculated using the County of San Bernardino Hydrology Manual and a 100-year design storm, as determined by the Town Engineer. Separately, every proposed development must capture, retain and infiltrate 100% of a 100-year, one-hour storm event that falls on the site.
The Code favors natural-looking retention through common-area retention or detention basins, storm water chambers and dry wells over engineered channels; concrete channels are to be avoided, and any channel the Town Engineer requires must use plants and stone lining where feasible. Basin depth is capped by size: a retention or detention basin smaller than one acre cannot exceed four feet in depth, and a basin one acre or larger cannot exceed eight feet, unless the Planning Commission approves a deeper basin under a Development Permit.
75, Water Conservation/Landscaping Regulations, with a landscape assessment district formed for ongoing maintenance of shared basins. Individual lot retention or detention basins are not allowed in new subdivisions; the Code requires common facilities instead. Dry wells in parking areas or street rights-of-way must use an interceptor well built to Town standards, and every retention basin must include dry wells or similar devices able to infiltrate the full design volume within 72 hours of a storm.
Violations & Fines
A drainage or storm water violation is enforced as a Development Code violation under Section 9.26.010: an infraction or misdemeanor under Municipal Code Section 1.01.200, punishable by up to $1,000 and six months in jail, with each day a separate offense under Section 9.26.030. The Town Engineer reviews compliance at the development-permit stage, and the Building Official or a Code Enforcement Officer may issue a $100/$200/$500 escalating administrative citation for a property that fails to control runoff after construction.
Frequently Asked Questions
Does Apple Valley require on-site stormwater retention for new homes?
How deep can a retention basin be in Apple Valley?
Can I build an individual retention basin on my new home's lot?
Sources & Official References
Other rules in Apple Valley
California rules heatmap·Compare Apple Valley to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Stormwater Management in Nearby Cities
How other cities in San Bernardino County handle stormwater management.