Auburn, WA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
ACC 13.48.225(D)(2)
Required plan
Construction SWPPP for erosion/sediment control
Downstream review distance
At least 1/4 mile
Enforcing office
City engineer / public works
Deviation request
Requires published public notice

Summary

Auburn requires a Construction Stormwater Pollution Prevention Plan for any project that disturbs land, spelling out clearing limits, sediment controls and slope stabilization. The plan must follow the city's Surface Water Management Manual under ACC 13.48.225, and the city engineer can order added best-management practices if a site keeps discharging sediment.

2. Preparation of a Construction Storm Water Pollution Prevention Plan for Erosion and Sediment Control. This plan shall be designed to comply with the requirements and purposes of the SWMM, this section, any other applicable sections of ACC Titles 15, 16, 17 and 18 and any departmental guidelines promulgated by the city engineer. The plan shall be designed, submitted and implemented to address the following: a. Mark clearing limits; b. Establish construction access routes and controls; c. Control flow rates; d. Install sediment controls; e. Stabilize soils; f. Protect slopes; g. Protect storm drain inlets; h. Stabilize channels and outlets; i. Control pollutants; j. Control dewatering; k. Maintain BMPs; l. Manage the project; and m. Protect LID BMPs.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 7023, passed July 6, 2026).

Full Breakdown

225(D), new development and redevelopment in Auburn must obtain city permits and comply with minimum requirements tied to the city's municipal stormwater NPDES permit and the Surface Water Management Manual (SWMM). Subsection (D)(2) specifically requires preparation of a Construction Storm Water Pollution Prevention Plan for Erosion and Sediment Control, designed to satisfy the SWMM and any applicable sections of ACC Titles 15, 16, 17 and 18. The plan must mark clearing limits, establish construction access routes and controls, control flow rates, install sediment controls, stabilize soils, protect slopes, protect storm drain inlets, stabilize channels and outlets, control pollutants, control dewatering, maintain BMPs, manage the project, and protect low impact development (LID) BMPs.

Existing single-family and duplex lots can be exempt from the separate storm water site plan requirement (not the erosion-control SWPPP) if the lot was approved under regulations in effect between January 1, 1987 and December 31, 2016, and can connect to an existing centralized storm water system. 10 ACC, and an off-site analysis extending at least one-quarter mile downstream for impacts including stream bank and channel erosion. 240 is required for land-disturbing activity, addition of hard surfaces, or work affecting a storm drainage facility, and it is unlawful to construct, connect to, or alter public or private storm drainage facilities without one.

226, but the city engineer must find the deviation equally protective of public health and water quality, and any deviation request triggers published public notice at the requester's cost.

Violations & Fines

Discharging sediment-laden runoff without an approved SWPPP, or working without the required storm drainage permit under ACC 13.48.240, is unlawful. A responsible party who fails to immediately collect, remove, contain or treat a discharge as directed by the city under ACC 13.48.210(B) is liable for the city's abatement expenses. The city engineer can require additional structural BMPs, and unresolved noncompliance can escalate to enforcement of the drainage permit requirements.

Frequently Asked Questions

Does every construction project in Auburn need an erosion control plan?
Any new development or redevelopment that triggers city permitting must prepare a Construction Storm Water Pollution Prevention Plan for erosion and sediment control under ACC 13.48.225(D)(2), designed to the Surface Water Management Manual and covering clearing limits, sediment controls and slope protection.
Can a builder skip the erosion control plan on a small residential lot?
Only the separate storm water site plan requirement has a narrow exemption, for existing single-family or duplex lots approved between 1987 and 2016 that connect to an existing centralized system; the erosion and sediment control SWPPP requirement itself is not exempted.
Who enforces Auburn's erosion control requirements?
The city engineer administers the Surface Water Management Manual and storm water program, can require additional best-management practices under ACC 13.48.225(C), and the city can recover its own abatement costs from a responsible party under ACC 13.48.210(B).

Sources & Official References

Other rules in Auburn

All Auburn rules

Compare Auburn to another location·View the Washington environmental rules overview

Get notified when Erosion Control in Auburn, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in King County handle erosion control.

Renton, WA
Some Restrictions
Kirkland, WA
Some Restrictions
Kent, WA
Some Restrictions
Bellevue, WA
Some Restrictions
Federal Way, WA
Some Restrictions
Seattle, WA
Some Restrictions