Summary
Farmersville requires every construction site's erosion and sedimentation controls to meet the city's design manual, its stormwater management plan, city ordinance or EPA rules, whichever is strictest, under Code § 65-49(b), pointing builders to the NCTCOG's regional best-practices manual.
(b)Erosion and sedimentation controls. All erosion and sedimentation controls shall conform to the design manual and standard construction details, stormwater management plan, city ordinance, or EPA requirements, whichever is most stringent. For erosion and sedimentation control, the city uses the latest edition of Storm Water Quality Best Management Practices for Construction Activities in North Central Texas (by the NCTCOG), a copy of which is on file at the city.
Full Breakdown
" The city does not publish its own stand-alone erosion manual; instead it incorporates by reference "the latest edition of Storm Water Quality Best Management Practices for Construction Activities in North Central Texas," published by the North Central Texas Council of Governments (NCTCOG), a copy of which is kept on file at city hall. This section sits inside Article III of Chapter 65 (Subdivisions), so it attaches to site development and subdivision construction activity citywide and within the extraterritorial jurisdiction, working alongside § 65-80's site development permit, which is required before any grading, filling, excavation or clearing begins and again requires "non-point source pollution controls, erosion controls, and tree protection measures and devices" to be in place, to the satisfaction of the city engineer, before construction starts.
Section 65-49(d) reinforces the same goal by directing that street, lot and building layouts follow natural contour lines and minimize cut and fill "to the greatest extent possible," so less land is disturbed and less sediment reaches the storm system. Because the standard floats to whichever authority sets the tightest requirement, a contractor cannot rely on the loosest of the three; the city engineer applies the most protective standard on a site-by-site basis when reviewing plans. These provisions were re-enacted by Ord. No. 2018-0508-002, § 3, adopted May 8, 2018.
Violations & Fines
Erosion-control violations fall under Chapter 65's general enforcement provision, § 65-12, which classifies any breach of the subdivision chapter as a misdemeanor carrying a fine of up to $2,000.00 per offense, with each day the violation continues treated as a separate offense; the city may also seek civil relief to restrain or correct the violation.
Frequently Asked Questions
What erosion control standard applies to construction sites in Farmersville?
Do I need a permit before I start grading or clearing a site?
Can I use a looser erosion-control method than the city's manual calls for?
Sources & Official References
Other rules in Farmersville
Texas rules heatmap·Compare Farmersville to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Collin County handle erosion control.