Farmersville, TX Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 65-49, Code of Ordinances
Design approval
Licensed engineer + city engineer sign-off
Ditch/channel alteration
Written city engineer permission required
Max fine
$2,000 per offense (§ 65-12)
Applies in
City limits and ETJ

Summary

In Farmersville, every storm water collection system must be designed by a licensed professional engineer and approved by the city engineer under Code of Ordinances § 65-49, and no one may alter a drainage ditch, channel or stream without the city engineer's written permission.

(a)System design requirements. Drainage improvements shall accommodate runoff from the upstream drainage area in its anticipated maximum "build-out" condition, and shall be designed to prevent overloading the capacity of the downstream drainage system. The city may require the phasing of development, the use of control methods such as retention or detention, or the construction of off-site drainage improvements in order to mitigate the impact of the proposed development. No storm water collection system shall be constructed unless it is designed in accordance with the city's design manual and standard construction details by a licensed professional engineer, and unless it is reviewed and approved by the city engineer. ... (c)Permission required. No person, individual, partnership, firm or corporation shall deepen, widen, fill, reclaim, reroute or change the course or location of any existing ditch, channel, stream or drainage way without first obtaining written permission of the city engineer and any other applicable agency (such as FEMA or the U.S. Army Corps of Engineers) having jurisdiction.

Full Breakdown

Farmersville's subdivision ordinance requires drainage improvements to handle the anticipated maximum "build-out" runoff from the upstream area without overloading the downstream system. Under § 65-49(a), the city may require phased development, retention or detention facilities, or off-site drainage improvements to mitigate a project's impact, and no storm water collection system may be built unless a licensed professional engineer designs it to the city's design manual and standard construction details and the city engineer reviews and approves the plans, including a full drainage layout and design calculations.

S. Army Corps of Engineers. The city engineer may also require a flood study, paid for by the developer, when storm drainage concerns arise on, above or below the property. Section 65-49(e) bars cross-street flow of runoff unless the city engineer approves it and it crosses on a concrete valley gutter, and § 65-49(f) requires above-ground retention and detention facilities to be maintained by a homeowners association. These rules were re-enacted by Ord. No. 2018-0508-002, § 3, adopted May 8, 2018, and apply within the city limits and its extraterritorial jurisdiction.

Violations & Fines

Chapter 65's general enforcement section, § 65-12, makes any violation of the subdivision chapter, including the drainage provisions in § 65-49, a misdemeanor punishable by a fine up to $2,000.00 per offense, with each day of continuing violation counted as a separate offense. The city may also pursue civil action to restrain, correct or abate a violation, whether the land lies inside the city limits or within its extraterritorial jurisdiction.

Frequently Asked Questions

Do I need a permit to alter a drainage ditch on my Farmersville property?
Yes. Section 65-49(c) makes it unlawful to deepen, widen, fill, reclaim, reroute or change the course of any existing ditch, channel, stream or drainage way without first getting the city engineer's written permission, plus approval from any other agency with jurisdiction such as FEMA or the Army Corps of Engineers.
Who has to design a new storm water system in a Farmersville subdivision?
A licensed professional engineer must design it to the city's design manual and standard construction details, and the city engineer must review and approve the plans, including the drainage layout and supporting calculations, before construction begins.
What happens if my development's runoff would overload downstream drainage?
The city can require you to phase the development, add retention or detention facilities, or build off-site drainage improvements to mitigate the impact before it will approve the storm water design under § 65-49(a).

Sources & Official References

Other rules in Farmersville

All Farmersville rules

Texas rules heatmap·Compare Farmersville to another location·View the Texas environmental rules overview

Get notified when Stormwater Management in Farmersville, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Collin County handle stormwater management.

Allen, TX
Light Restrictions
McKinney, TX
Light Restrictions
Frisco, TX
Significant Restrictions
Plano, TX
Significant Restrictions