Florence County, SC Environmental Rules: Erosion Control (2026)
Key Facts
- Purpose clause
- Stop excessive soil erosion and sedimentation (§ 9.5-1)
- Inspector standard
- 'Qualified personnel' for sites over 1 acre
- Plan sign-off
- Registered engineer, landscape architect or surveyor
- Civil penalty
- Up to $1,000.00 per violation
- Enforcement tool
- Written stop-work order (§ 9.5-34)
- Administering agency
- Florence County Engineering Division
Summary
Florence County's stormwater and sediment control ordinance exists in large part to stop excessive soil erosion and sedimentation on unincorporated land, per § 9.5-1's purpose clause. Construction sites disturbing more than one acre must be inspected by 'qualified personnel' trained in erosion and sediment control practices under § 9.5-34, and violators of the article face a civil penalty of up to $1,000.00 under § 9.5-35.
this stormwater management and sediment control article is enacted to protect the lands and waters from the effects of excessive soil erosion and sedimentation, to prevent siltation of streams and lakes, to prevent clogging of draining channels, to prevent excessive flood damage and to prevent damage to the property of adjacent landowners. ... For projects that disturb more than one acre, the term "qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact stormwater quality and to assess the effectiveness of any sediment and erosion control measures selected to control the quality of stormwater discharges from the construction activity. ... Any person who violates any provision of this article ... is subject to a civil penalty of not more than $1,000.00 for each violation.
Full Breakdown
Section 9.5-1(a) states the article's purpose in erosion-specific terms: it exists to protect the county's lands and waters from the effects of excessive soil erosion and sedimentation, to prevent siltation of streams and lakes, clogging of drainage channels, flood damage and damage to adjacent landowners' property. That purpose is carried out through Article III, Plan and Application, where § 9.5-51 requires every stormwater management and sediment control plan to be sealed by a qualified design professional, registered engineer, landscape architect or Tier B land surveyor, and to follow the erosion and sediment control best management practices set out in the county's Stormwater Design Manual and DHEC's BMP Handbook.
Inspection is where the erosion-control standard becomes concrete. Section 9.5-34(b) defines 'qualified personnel' for any project disturbing more than one acre as a person knowledgeable in erosion and sediment control principles who can assess site conditions that could affect stormwater quality and judge whether the chosen sediment and erosion control measures are working. That person must be the SWPPP's preparer, someone under that preparer's direct supervision, or a state-certified construction site inspector. The Engineering Division notifies the responsible party in writing of any violation found, describing the nature of the problem, the corrective action required and the deadline for fixing it, and can issue a written stop-work order when off-site sedimentation is damaging a lake, waterway or neighboring land.
Violating the erosion and sediment control requirements carries the same civil exposure as any other breach of the article, up to $1,000.00 per violation under § 9.5-35, with misdemeanor penalties layered on top for negligent, willful or intentional violations.
Violations & Fines
A person who conducts land disturbing activity without an approved erosion and sediment control plan, or who fails to follow one, is subject to a civil penalty of not more than $1,000.00 for each violation under § 9.5-35. Willful or negligent violations are also misdemeanors, and the Engineering Division can issue a written stop-work order when off-site sedimentation is damaging a waterway or adjoining property.
Frequently Asked Questions
What does Florence County's erosion control ordinance actually cover?
Who has to inspect an erosion control plan on a Florence County construction site?
What is the penalty for an erosion control violation in Florence County?
Sources & Official References
Other rules in Florence County
Compare Florence County to another location·View the South Carolina environmental rules overview