Florence County, SC Environmental Rules: Stormwater Management (2026)
Key Facts
- Permit required for
- All land disturbing activity (§ 9.5-28)
- Plan review time
- 20 working days, then auto-approved
- Application fee
- Nonrefundable, per disturbed acre (§ 9.5-30)
- Civil penalty
- Up to $1,000.00 per violation
- Misdemeanor penalty
- Up to $500 fine or 30 days
- Administering agency
- Florence County Engineering Division
Summary
Unincorporated Florence County requires a stormwater management and sediment control permit for land disturbing activity under Chapter 9.5, administered by the county Engineering Division under its NPDES permit. Florence County Code § 9.5-28 requires a plan before any permit issues, § 9.5-29 sets a 20-working-day review clock, and § 9.5-35 backs the program with civil penalties up to $1,000.00 per violation.
Unless otherwise exempt under this article, all land disturbing activities are required to obtain permit coverage for their stormwater discharges by submitting a stormwater management and sediment control plan. The plan shall be prepared in accordance with the requirements of section 9.5-51 of this chapter and the Florence County Stormwater Design Manual. ... The person responsible for the land disturbing activity shall apply in writing to the county engineering division for a permit for such activity. ... The application for a stormwater management and sediment control p ... ermit to disturb land in the county shall be accompanied by nonrefundable fees. ... Any person who violates any provision of this article or who initiates or continues a land disturbing activity, for which a stormwater management and sediment control plan is required, except in accordance with the terms, conditions and provisions of an approved plan, is subject to a civil penalty of not more than $1,000.00 for each violation. ... Upon conviction, a person who violates this article may be fined not more than $500.00 or confined for not more than 30 days for each violation.
Full Breakdown
Florence County's Stormwater Management Plan, adopted under § 9.5-26, is the county's official operational program for complying with its NPDES permit, and the county Engineering Division administers it through the Florence County Stormwater Design Manual referenced in § 9.5-27. Section 9.5-28 requires every land disturbing activity, unless specifically exempt, to obtain permit coverage by submitting a stormwater management and sediment control plan prepared to the standards in § 9.5-51. Under § 9.5-29, the person responsible must apply in writing to the Engineering Division, and the division has 20 working days to approve the plan or return comments; if it misses that deadline, the plan is automatically considered approved. Larger projects disturbing an acre or more must have the plan sealed by a licensed design professional, while smaller, non-common-plan projects under an acre can submit without one.
Section 9.5-30 requires a nonrefundable application fee, set by the Engineering Division and approved by county council, scaled per disturbed acre up to a capped maximum, with separate fees for waivers, variances, permit extensions and major plan changes; DHEC's own NPDES issuance fee is charged on top of the county's fee for activity of an acre or more. Waivers and variances under §§ 9.5-31 and 9.5-32 are decided on the same 20-working-day clock, with automatic approval on a missed deadline, and appeals from Engineering Division decisions go to the county planning commission under § 30-297.
Violating an approved plan, or disturbing land without one, draws a civil penalty of up to $1,000.00 per violation under § 9.5-35, on top of misdemeanor exposure for negligent, willful or intentional violations.
Violations & Fines
Any person who violates the article or disturbs land without an approved plan faces a civil penalty of not more than $1,000.00 per violation under § 9.5-35. A related misdemeanor conviction can carry a fine of up to $500.00, imprisonment of up to 30 days, or both, and the Engineering Division can also issue a stop-work order and refuse further permits until violations are corrected.
Frequently Asked Questions
Do I need a stormwater permit to disturb land in unincorporated Florence County?
How long does Florence County take to review a stormwater plan?
What are the penalties for violating Florence County's stormwater rules?
Sources & Official References
Other rules in Florence County
Compare Florence County to another location·View the South Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.