Key Facts
- Governing section
- § 15.06.090, CBC Appendix J § J112.1
- Sediment-loss cap
- no more than pre-grading natural erosion rate
- Control measures
- sediment basins/traps ordered by Building Official
- Removal condition
- temporary facilities removed only after written approval
- Related sections
- J113.1 setbacks, J114.1 runoff, J115.1 revegetation
Summary
In the City of Gardena, every grading project must keep sediment on site to the greatest extent feasible and hold the post-project erosion rate to no more than the natural rate before grading began, under Appendix J Section J112.1 as adopted at § 15.06.090. The Building Official can order sediment basins, traps or other control measures before clearing begins if erosion looks excessive.
§ 15.06.090. Appendix J, Grading. Appendix J is hereby amended to add the following sections to read as follows: Section J112.1 Sediment control. A. Sediment caused by the grading project shall be retained on the site to the greatest extent feasible. The maximum permanent rate of sediment loss after completion of the project should not exceed the natural erosion rate which occurred prior to the grading project. If, in the opinion of the building official, excessive erosion occurs from the project, erosion and sediment control measures shall be immediately implemented to reduce erosion to allowable levels. B. If required by the building official, sediment basins, sediment traps, or similar sediment control measures, temporary or permanent, shall be installed prior to clearing and grading operations. Upon completion of construction and stabilization of soils, all temporary erosion control facilities shall be removed from the site upon written approval of the building official.
Full Breakdown
Gardena Municipal Code § 15.06.090 adds several sections to Appendix J (Grading) of the 2022 California Building Code, and Section J112.1, Sediment Control, is the operative erosion rule. It requires that sediment caused by a grading project be retained on the site to the greatest extent feasible, and sets the maximum permanent post-project sediment-loss rate at the natural erosion rate that existed before grading began; if the Building Official finds excessive erosion occurring from the project, erosion and sediment control measures must be implemented immediately to bring the rate back down.
Section J112.1(B) lets the Building Official require sediment basins, sediment traps or similar temporary or permanent control measures before clearing and grading operations start, and requires that temporary erosion facilities be removed once construction is complete and soils are stabilized, with the Building Official's written approval. The same amendment package adds companion sections read together with J112.1: Section J113.1 lets the Building Official or a civil, soils or geotechnical engineer increase the minimum setbacks in Appendix J for safety, stability or drainage access; Section J114.1 requires approved erosion and sediment control devices for all grading and filling, including energy-absorbing devices and sedimentation basins; and Section J115.1 requires mulching, seeding or other stabilization of exposed slopes, preferring native or locally adapted plants.
Violations & Fines
Grading without the sediment and erosion controls the Building Official requires under Section J112.1, or removing temporary erosion facilities before the Building Official signs off on soil stabilization, is enforceable the same as any other Building Code violation under § 15.06.050 and § 1.16.010: the Building Official can issue a stop-work order, the city attorney can prosecute the violation as a misdemeanor punishable by up to $1,000 and six months in jail, or reduce it to a graduated infraction, and sediment sent off-site can additionally trigger nuisance-abatement cost recovery under § 1.16.010(J).
Frequently Asked Questions
What sediment control does Gardena require during grading?
Can Gardena order extra erosion controls mid-project?
When can temporary erosion control facilities be removed in Gardena?
Sources & Official References
Other rules in Gardena
California rules heatmap·Compare Gardena to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Los Angeles County handle erosion control.