Skip to main content
CityRuleLookup

Garland County, AR Environmental Rules: Erosion Control (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Sites over 1 acre or any commercial site
Large sites
Over 5 acres need county + ADEQ permit
Small-site fee
$75.00
5-10 acre fee
$100.00
Over 10 acre fee
$200.00
Review time
7 business days for special-plan sites

Summary

Construction sites in unincorporated Garland County disturbing one acre or more, or any commercial site regardless of size, must submit a stormwater pollution prevention plan (SWPPP) to the Garland County Inspections Division before work begins, install best management practices, and pay a permit fee of $75.00 to $200.00 based on acreage, per Garland County Code § 56-48.

These county ordinances apply to unincorporated areas of Garland County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

GC requires all small construction sites to submit a stormwater pollution prevention plan (SWPPP) for review prior to construction to the Garland County Inspections Division. GCID will conduct on-site inspections of the permitted construction sites to ensure compliance with local, state, and federal regulations. ... (a)Develop stormwater pollution prevention plan (SWPPP).(b)Submit the SWPPP to GCID prior to construction for review and issuance of GC Permit.(c)Post On-site (ADEQ) Stormwater Construction Notice.(d)Use Best Management Practices (BMPs) to reduce runoff.(e)Maintain SWPPP and rain gauge on-site and inspect stormwater controls weekly and within 24 hours of all rain events ½ inch or greater.(f)Remove all unnecessary BMPs after final stabilization.(g)All construction sites are required to have a solid waste dumpster located at the site to properly dispose of building materials and solid waste.

Full Breakdown

Garland County Code § 56-48 sets erosion and sediment control requirements under the county's Stormwater and Drainage Ordinance. Small construction sites disturbing more than one but less than five acres, or any part of a larger common plan regardless of size, must submit a stormwater pollution prevention plan (SWPPP) to the Garland County Inspections Division (GCID) for review before construction starts; GCID then inspects the permitted site to confirm compliance with local, state and federal rules, and reports actual or potential violations to the Arkansas Department of Environmental Quality (ADEQ).

Site requirements under the SWPPP include developing the plan, submitting it to GCID for permit issuance, posting an on-site ADEQ stormwater construction notice, using best management practices (BMPs) to reduce runoff, keeping the SWPPP and a rain gauge on site, inspecting stormwater controls weekly and within 24 hours of any rain event of half an inch or more, removing unnecessary BMPs once the site is stabilized, and keeping a solid waste dumpster on site for construction debris. Medium and large sites disturbing more than five acres require both a county permit and an ADEQ permit; GCID reviews the ADEQ SWPPP and Notice of Coverage before issuing its own permit and reports unpermitted large sites to ADEQ.

Any site under one acre that pollutes or threatens to pollute a water body, and every commercial site regardless of size, must also submit a SWPPP for special-plan review, with permits issued within seven business days of submittal under § 56-48(3). 00 for sites over ten disturbed acres.

Violations & Fines

Building without a required SWPPP, or without a county or ADEQ permit, is enforced under §§ 56-52 through 56-54: GCID can issue a stop-work order, and if a site becomes a danger to public health or safety the county can enter without prior notice to correct the violation and bill the property owner. Fines run $100.00 to $500.00 per offense under § 56-54, plus up to $250.00 per day for a continuing violation.

Frequently Asked Questions

When does Garland County require a SWPPP for construction?
Any site disturbing more than one acre, any part of a larger common plan, and every commercial site regardless of size must submit a stormwater pollution prevention plan to the Garland County Inspections Division before construction, per § 56-48.
How much is a Garland County erosion control permit?
Fees run $75.00 for sites under five disturbed acres or requiring special-plan review, $100.00 for five to ten acres, and $200.00 for over ten disturbed acres, per § 56-49.
What BMPs does Garland County require on a construction site?
Sites must use best management practices to reduce runoff, keep a rain gauge and inspect stormwater controls weekly and within 24 hours of a half-inch rain event, and remove unnecessary BMPs once the site is stabilized, per § 56-48.
Do large construction sites need a separate ADEQ permit in Garland County?
Yes. Sites disturbing more than five acres need both an ADEQ permit and Notice of Coverage and a Garland County Inspections Division permit before construction, per § 56-48.

Sources & Official References

Other rules in Garland County

All Garland County rules

Compare Garland County to another location·View the Arkansas environmental rules overview

Get notified when Erosion Control in Garland County, AR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.