Key Facts

Application requirement
erosion-control plan, § 6-213(a)(12)
Topsoil depth
at least 4 inches over exposed areas
Enforcing officer
Commissioner of Public Works
Required notices
rough grading, final grading, completion
Fine range
$10 to $100 per violation

Summary

In the Town of Greenwich, an excavation, grading or filling permit application under Code of Ordinances § 6-213(a)(12) must detail soil erosion control methods, and completed work must meet the § 6-220 topsoil retention and revegetation standards enforced by the Commissioner of Public Works.

(12)Details of soil preparation and of revegetation or of other methods of soil erosion control. ... (2)If the proposed method of soil erosion control is by revegetation, the specifications for the work shall provide that any layer of topsoil over the area to be excavated, graded or filled shall be set aside and retained on the premises in sufficient quantity to cover all surfaces which will remain exposed, except rock, to a depth of at least four (4) inches, with topsoil added if necessary to make up any deficiency. The specifications shall also provide that at the completion of respreading of topsoil it shall immediately be harrowed or raked to establish a seed bed and shall be seeded for grass, permanent pasture mixture, or other approved fast growing vegetation and shall be repeated as often as necessary until the area is stabilized.

Full Breakdown

Under Chapter 6, Article 2, anyone excavating, grading or filling land in Greenwich (beyond the small exemptions in § 6-210) needs a permit from the Commissioner of Public Works, and § 6-213(a)(12) requires the application to include details of soil preparation and of revegetation or other methods of soil erosion control, alongside topography, drainage and access-way plans. Once work is complete, § 6-220(a)(1) requires excavated pits and fill areas to be graded to the level of adjoining properties or to a grade that allows natural drainage.

Section 6-220(a)(2) sets the revegetation standard directly: where erosion control is by revegetation, topsoil removed from the site must be set aside and retained in sufficient quantity to cover all exposed surfaces except rock to a depth of at least four inches, adding topsoil if needed, and the resurfaced area must be harrowed or raked into a seed bed and seeded with grass, permanent pasture mixture, or other approved fast-growing vegetation, repeated as often as necessary until the area is stabilized. The applicant must notify the Commissioner at rough grading, final grading before seeding, and completion under § 6-220(a)(5), and the Commissioner makes field inspections at each of those stages to confirm the work matches the approved plan.

Violations & Fines

Section 6-221 sets the penalty for the whole Article, including a failure to carry out required erosion control: a fine of $10 to $100 for each violation, with every day a violation continues after written notice from the Commissioner of Public Works treated as a separate offense. The Commissioner may also sue to enjoin the violation or compel compliance rather than rely on fines alone.

Frequently Asked Questions

What must my Greenwich grading permit application say about erosion?
Section 6-213(a)(12) requires the application to include details of soil preparation and of revegetation or other methods of soil erosion control, submitted with the engineer-sealed plans and the rest of the application package to the Commissioner of Public Works.
How much topsoil has to be saved for revegetation in Greenwich?
Under § 6-220(a)(2), if erosion control is by revegetation, the removed topsoil must be set aside and kept on the premises in enough quantity to cover all surfaces that will remain exposed, except rock, to a depth of at least four inches, adding more topsoil if there is a shortfall.
Does the Town inspect erosion control work as it happens?
Yes. Section 6-220(a)(5) requires the applicant to notify the Commissioner of Public Works at rough grading, final grading before seeding, and completion, and the Commissioner makes field inspections at each stage to confirm the work matches the approved plan.

Sources & Official References

Other rules in Greenwich

All Greenwich rules

Compare Greenwich to another location·View the Connecticut environmental rules overview

Get notified when Erosion Control in Greenwich, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.